Project execution process involves planning, executing, monitoring, controlling, and closing a project.
Planning phase involves defining project scope, objectives, and deliverables
Executing phase involves implementing the plan and completing the project tasks
Monitoring phase involves tracking project progress and making necessary adjustments
Controlling phase involves managing project risks and ensuring quality standards...
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2021. There were 2 interview rounds.
They ask to many technical question and ask to code also
They ask for your background and thing you learnt in your past
Balloon Burst Problem - Given n balloons, each with a number of coins, maximize the number of coins collected by bursting the balloons.
Use dynamic programming to solve the problem
Consider each balloon as the last balloon to be burst
Calculate the maximum coins that can be collected for each subarray of balloons
Use the calculated values to find the maximum coins for the entire array
CFMEA stands for Control Failure Mode and Effects Analysis.
CFMEA is a systematic approach used to identify and mitigate potential failures in a process or system.
It involves analyzing failure modes, their causes, and the potential effects on the process or system.
CFMEA helps in prioritizing and implementing control measures to prevent or minimize failures.
It is commonly used in industries such as manufacturing, automot...
System level DFMEA is given main preference.
System level DFMEA considers the entire system and its interactions.
Component level DFMEA focuses on individual components.
System level DFMEA is more comprehensive and effective in identifying potential failures.
Example: In automotive industry, system level DFMEA would consider the entire vehicle and its subsystems.
Example: In medical devices, system level DFMEA would conside...
I applied via Referral and was interviewed before Jan 2020. There were 4 interview rounds.
Processes required in any project include planning, execution, monitoring, and closing.
Planning involves defining project goals, scope, and resources.
Execution involves carrying out the plan and completing project tasks.
Monitoring involves tracking progress and making adjustments as needed.
Closing involves wrapping up the project and evaluating its success.
Examples of project processes include risk management, quality
Points to check in an invoice before processing
Check for accuracy of billing information
Verify the amount charged and ensure it matches the agreed upon price
Ensure all necessary supporting documents are attached
Check for any discounts or promotions that may apply
Verify the payment terms and due date
Ensure the invoice is addressed to the correct recipient
Check for any errors or discrepancies
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.
Production Supervisor
7
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Quality Engineer
6
salaries
| ₹2 L/yr - ₹3 L/yr |
Assistant Manager - Production
4
salaries
| ₹3.9 L/yr - ₹8 L/yr |
NPI Engineer
4
salaries
| ₹2 L/yr - ₹4 L/yr |
Purchase Executive
3
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Tata Motors
Asian Paints
Tata Steel
Maruti Suzuki