Critical lifting refers to the process of lifting heavy or delicate loads that require careful planning and execution to ensure safety and prevent damage.
Critical lifting involves lifting loads that are heavy or delicate and require special attention.
It requires careful planning and coordination to ensure the safety of personnel and equipment.
Factors such as load weight, center of gravity, lifting equipment, and enviro...
The lifting plan is typically the responsibility of the rigging engineer or supervisor.
The rigging engineer or supervisor is responsible for creating and implementing a lifting plan.
They assess the load, determine the appropriate rigging equipment and techniques, and ensure compliance with safety regulations.
The lifting plan may also involve coordination with other departments or personnel, such as crane operators or p...
Top trending discussions
posted on 28 Feb 2022
I applied via Walk-in and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 7 Feb 2023
posted on 20 May 2024
I applied via Referral and was interviewed in Apr 2024. There was 1 interview round.
I will evaluate the subcontractor's qualifications, experience, and track record before considering them for the contract.
Review the subcontractor's past work and references
Assess the subcontractor's financial stability and capacity to complete the work
Negotiate terms and conditions of the contract to ensure clarity and alignment of expectations
Monitor the subcontractor's performance throughout the project to ensure qu...
posted on 6 Jan 2021
I applied via Referral and was interviewed before Jan 2020. There were 7 interview rounds.
I appeared for an interview in Sep 2016.
I am a recent graduate with a degree in Computer Science and a passion for coding and problem-solving.
Graduated with a degree in Computer Science
Passionate about coding and problem-solving
Completed internships at tech companies
Participated in coding competitions
The AIAG manual Daily Work Management is a guide for managing daily work activities in the automotive industry.
The manual provides guidelines for managing daily work activities such as production planning, scheduling, and quality control.
It emphasizes the importance of continuous improvement and problem-solving techniques.
The manual also includes tools and templates for tracking and analyzing data to identify areas for...
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
Configuration of instruments involves setting up and adjusting instruments for optimal performance.
Configuration involves selecting appropriate measurement ranges and units.
Calibration of instruments is necessary to ensure accuracy.
Proper wiring and connection of instruments is crucial.
Configuration may also involve programming of instruments for specific tasks.
Regular maintenance and troubleshooting is important to en
Calibration of instruments is a crucial process to ensure accurate and reliable measurements.
Calibration involves comparing the readings of an instrument to a known standard.
Adjustments are made to the instrument to bring it into alignment with the standard.
Calibration should be performed regularly to maintain accuracy.
Documentation of calibration procedures and results is important for quality control and compliance.
E...
I applied via Google and was interviewed before Jul 2021. There were 2 interview rounds.
About knowledge and experience
I appeared for an interview in Mar 2017.
Mechanical Supervisor
18
salaries
| ₹7.3 L/yr - ₹15 L/yr |
Project Engineer
14
salaries
| ₹18 L/yr - ₹36.4 L/yr |
HSE Advisor
12
salaries
| ₹15 L/yr - ₹24 L/yr |
Civil Supervisor
10
salaries
| ₹5.4 L/yr - ₹12.6 L/yr |
Planning Engineer
9
salaries
| ₹11 L/yr - ₹25 L/yr |
Sterling Oil Exploration & Energy Production
Kuwait National Petroleum Company
Madina Group
Valmet