Track gauge refers to the distance between the inner sides of the two rails on a railway track.
Standard gauge: 4 feet 8.5 inches (1,435 mm)
Narrow gauge: less than standard gauge
Broad gauge: wider than standard gauge
Dual gauge: two or more gauges sharing the same track bed
Switches and crossings are components of railway tracks that allow trains to change tracks or cross over to different tracks.
Switches are movable rails that allow trains to change tracks
Crossings are points where two tracks intersect or cross over each other
Switches and crossings are essential for ensuring smooth and safe movement of trains on railway tracks
Top trending discussions
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.
Determine the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, water, and admixtures
Calculate the proportions of each material based on desired properties and specifications
Perform trial mixes to test the properties of the co...
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Senior Engineer
9
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Surveyor
7
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Track Engineer
6
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Safety Officer
6
salaries
| ₹3.5 L/yr - ₹4.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim