Upload Button Icon Add office photos

Amphenol Interconnect

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Amphenol Interconnect Assembly Operator Interview Questions and Answers

Updated 4 Oct 2021

Amphenol Interconnect Assembly Operator Interview Experiences

1 interview found

I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Qualification details

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer confidently

Interview questions from similar companies

I applied via Referral and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Group Discussion 

Resume advantage

Interview Preparation Tips

Interview preparation tips for other job seekers - Perfect Resume or skills and management objectives goals.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your qualification?
  • Ans. 

    Bachelor's degree in Mechanical Engineering

    • Bachelor's degree in Mechanical Engineering

    • Specialized in manufacturing processes and machinery

    • Relevant coursework in assembly line operations

    • Hands-on experience with assembly tools and equipment

  • Answered by AI
  • Q2. Can you work in a assembly shop?
  • Ans. 

    Yes, I have experience working in assembly shops and am comfortable with the environment.

    • Yes, I have previous experience working in assembly shops.

    • I am familiar with the tools and equipment commonly used in assembly work.

    • I am comfortable working in a fast-paced environment and meeting production deadlines.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If your higher qualification includes additional rounds and some tests during that time, I suggest you better opportunity outside if your are non IT and other qualification.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. About study's before company
Round 3 - HR 

(1 Question)

  • Q1. About experience & salary expectations

I applied via Walk-in and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Internal 15 Questions and medical checkup

Round 3 - HR 

(3 Questions)

  • Q1. Family Background and work
  • Q2. Last company name and how much year experience
  • Ans. 

    I have 5 years of experience as a Machine Operator at XYZ Company.

    • Worked at XYZ Company for 5 years as a Machine Operator

    • Operated various types of machines, including CNC machines and injection molding machines

    • Ensured machines were set up correctly and monitored their performance

    • Performed routine maintenance and troubleshooting on machines

    • Maintained a safe and clean work environment

    • Collaborated with team members to mee

  • Answered by AI
  • Q3. When are you joining
  • Ans. 

    I will be joining on [date].

    • I am scheduled to start on [date].

    • My joining date is set for [date].

    • I will officially join the company on [date].

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Molex Machine Operator interview:
  • Wiring Harness
Interview preparation tips for other job seekers - Go neet shaving and carry Xerox copy your documents
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Project in college
  • Ans. 

    I worked on a project in college where I developed a mobile app for tracking fitness goals.

    • Researched user needs and preferences

    • Designed user interface and user experience

    • Developed app using programming languages like Java and Swift

    • Tested app for functionality and usability

    • Received positive feedback from users during testing

  • Answered by AI
  • Q2. Internship in college

I applied via Naukri.com and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. 5s
  • Q2. Kizen
  • Q3. Pokayoke

Interview Preparation Tips

Interview preparation tips for other job seekers - Selected

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is line balancing?
  • Ans. 

    Line balancing is the process of optimizing workloads across a production line to improve efficiency and reduce bottlenecks.

    • It involves analyzing the tasks required to complete a product and assigning them to workstations in a way that minimizes idle time and maximizes throughput.

    • Line balancing can help reduce production costs, increase output, and improve quality.

    • Examples of line balancing techniques include time stud...

  • Answered by AI
  • Q2. How manpower is allocated?
  • Ans. 

    Manpower allocation is based on project requirements, skill sets, availability, and workload.

    • Manpower allocation is a crucial aspect of production engineering.

    • It involves identifying the required skill sets for a project.

    • Availability of resources is also taken into consideration.

    • Workload is another factor that determines manpower allocation.

    • The allocation process is dynamic and can change based on project progress and

  • Answered by AI
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why should we hire you?
  • Q5. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Just update your skills in your CV which you know.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about kiazen,and 7qc tools
  • Ans. 

    Kaizen is a Japanese term for continuous improvement and 7QC tools are quality control techniques used to identify and solve problems.

    • Kaizen involves making small, incremental improvements to processes and systems to increase efficiency and reduce waste.

    • 7QC tools include Pareto charts, cause-and-effect diagrams, flowcharts, histograms, scatter diagrams, control charts, and check sheets.

    • These tools are used to analyze d...

  • Answered by AI
  • Q2. Tell me about 8D analysis, & six Sigma, SPC
  • Ans. 

    8D analysis, Six Sigma, and SPC are quality control methodologies used in production engineering.

    • 8D analysis is an eight-step problem-solving methodology used to identify, correct, and prevent recurring problems.

    • Six Sigma is a data-driven approach to quality control that aims to reduce defects and improve processes.

    • SPC (Statistical Process Control) is a method of monitoring and controlling a process to ensure it operat...

  • Answered by AI
  • Q3. Explain about OEE, & explain about 5 types of wastes
  • Ans. 

    OEE is a metric used to measure manufacturing productivity. 5 types of wastes are defects, overproduction, waiting, non-utilized talent, and transportation.

    • OEE stands for Overall Equipment Effectiveness and is a measure of how effectively a manufacturing operation is utilized

    • It is calculated by multiplying availability, performance, and quality

    • The 5 types of wastes are defects, overproduction, waiting, non-utilized tal...

  • Answered by AI
Round 3 - HR 

(3 Questions)

  • Q1. Tell me about yourself, about your background
  • Q2. What is your responsibility in shop floor
  • Q3. What are your skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go here no job security, heavy pressure in shop floor

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is aspect ratio?
  • Ans. 

    Aspect ratio is the ratio of an object's width to its height.

    • Aspect ratio is commonly used in design and engineering to maintain proportionality.

    • It is often expressed as a ratio, such as 16:9 for a widescreen TV.

    • Aspect ratio can affect the visual perception and usability of a product.

    • It is important to consider aspect ratio when designing graphics or layouts for different devices or mediums.

  • Answered by AI
  • Q2. How do you decide stackup?
  • Ans. 

    Stackup is decided based on the number of layers, signal integrity requirements, and manufacturing constraints.

    • Consider the number of layers required for the design

    • Evaluate signal integrity requirements and impedance control

    • Take into account manufacturing constraints such as minimum trace width and spacing

    • Balance cost and performance

    • Use simulation tools to optimize the stackup

    • Consult with PCB fabricators for their reco

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to improve skills on Highspeed concepts
Contribute & help others!
anonymous
You can choose to be anonymous

Recently Viewed

INTERVIEWS

Amphenol Interconnect

No Interviews

INTERVIEWS

Amphenol Interconnect

No Interviews

INTERVIEWS

Amphenol Interconnect

No Interviews

SALARIES

Linde India

SALARIES

Bhanzu

LIST OF COMPANIES

Amphenol Interconnect

Locations

JOBS

Amphenol Interconnect

No Jobs

SALARIES

Linde India

SALARIES

Bhanzu

SALARIES

Amphenol Interconnect

Tell us how to improve this page.

Interview Questions from Similar Companies

Flex Interview Questions
4.0
 • 186 Interviews
GAO Tek Interview Questions
4.4
 • 170 Interviews
TE Connectivity Interview Questions
4.1
 • 83 Interviews
Molex Interview Questions
3.9
 • 53 Interviews
Hind Rectifiers Interview Questions
3.6
 • 14 Interviews
View all
Amphenol Interconnect Assembly Operator Salary
based on 13 salaries
₹1.5 L/yr - ₹2.6 L/yr
7% less than the average Assembly Operator Salary in India
View more details

Amphenol Interconnect Assembly Operator Reviews and Ratings

based on 8 reviews

4.2/5

Rating in categories

3.8

Skill development

4.4

Work-life balance

4.3

Salary

3.4

Job security

4.5

Company culture

3.1

Promotions

4.1

Work satisfaction

Explore 8 Reviews and Ratings
Quality Engineer
162 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Engineer
161 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Inspector
123 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
85 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Quality Controller
84 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Amphenol Interconnect with

TE Connectivity

4.1
Compare

Molex

3.9
Compare

Delphi Automotive Systems

3.9
Compare

Jabil

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview