Filter interviews by
I applied via Referral and was interviewed in Nov 2022. There were 3 interview rounds.
It is unclear what 4m, 3g, 3m...etc refers to without additional context.
Without additional context, it is impossible to determine the meaning of this sequence of letters and numbers.
It could potentially be a code or abbreviation used in a specific industry or field.
Further information or clarification would be needed to provide a more accurate answer.
Takt time is the rate at which a product must be produced to meet customer demand. Bottleneck is a point of congestion in a production system.
Takt time is calculated by dividing the available production time by the customer demand.
Bottlenecks can be identified by analyzing the flow of materials and resources through the production system.
To reduce bottlenecks, solutions such as increasing capacity, improving processes,...
Top trending discussions
based on 5 reviews
Rating in categories
Senior Engineer
138
salaries
| ₹2.2 L/yr - ₹8.5 L/yr |
Assistant Manager
115
salaries
| ₹4.5 L/yr - ₹10.5 L/yr |
Quality Engineer
115
salaries
| ₹1.4 L/yr - ₹5.8 L/yr |
Engineer
104
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
Production Engineer
72
salaries
| ₹1.4 L/yr - ₹6 L/yr |
Blue Star
Voltas
Johnson Controls Hitachi Air Conditioning
Daikin