Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2020. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
Department and work related question.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
Supply chain is the process of managing the flow of goods and services from the point of origin to the point of consumption.
Supply chain involves the coordination and integration of various activities such as procurement, production, transportation, warehousing, and distribution.
It includes the movement of raw materials, work-in-progress goods, and finished products.
Supply chain management aims to optimize efficiency, ...
A boiler is a closed vessel in which water or other fluid is heated to generate steam or hot water.
Boilers are commonly used in industries and residential buildings for heating purposes.
They work by transferring heat from a fuel source to the water or fluid inside the boiler.
The heated water or steam is then circulated throughout the building or used for various processes.
Boilers can be fueled by various sources such a...
I applied via Job Portal
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
based on 1 interview
Interview experience
Service Engineer
46
salaries
| ₹1.3 L/yr - ₹4 L/yr |
Assistant Engineer
45
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Senior Engineer
37
salaries
| ₹4.2 L/yr - ₹9.5 L/yr |
Assistant Manager
36
salaries
| ₹6 L/yr - ₹11.6 L/yr |
Deputy Engineer
20
salaries
| ₹2.9 L/yr - ₹5.6 L/yr |
Bosch
Faurecia
Aptiv
Continental