I applied via LinkedIn and was interviewed in Jan 2024. There was 1 interview round.
S curve in P6 is a graphical representation of project progress over time in Primavera P6 software.
S curve shows planned progress, actual progress, and forecasted progress of a project.
It helps in visualizing project performance and identifying any deviations from the planned schedule.
S curve can be used to track project milestones, critical activities, and overall project health.
It is a useful tool for project manager...
Top trending discussions
posted on 26 Oct 2022
The cycle time of a residential flat depends on various factors such as size, complexity, location, and availability of resources.
Cycle time can range from a few months to a few years depending on the project.
Factors such as obtaining permits, construction time, and finishing work can affect the cycle time.
Availability of resources such as labor, materials, and equipment can also impact the cycle time.
Location can also...
based on 1 interview
Interview experience
Process Engineer
60
salaries
| ₹7 L/yr - ₹27 L/yr |
Engineer
44
salaries
| ₹6.7 L/yr - ₹24 L/yr |
Process Control Engineer
36
salaries
| ₹7.9 L/yr - ₹22.2 L/yr |
Piping Designer
32
salaries
| ₹6 L/yr - ₹24.8 L/yr |
Document Controller
25
salaries
| ₹4.2 L/yr - ₹12.4 L/yr |
Linde India
Praxair
INOX Air Products
Goyal MG Gases