I applied via Approached by Company and was interviewed in May 2024. There were 3 interview rounds.
Substation structure for a 33kV line includes equipment such as transformers, circuit breakers, isolators, and lightning arresters.
Substation must have transformers to step down voltage from 33kV to lower levels for distribution.
Circuit breakers are used to protect the system from overloads and short circuits.
Isolators are used for isolating equipment for maintenance purposes.
Lightning arresters protect the equipment f...
APFC (Automatic Power Factor Correction) capacitor banks are used to improve power factor and reduce reactive power consumption in electrical systems.
Improves power factor by reducing reactive power consumption
Helps in reducing electricity bills by avoiding penalties for low power factor
Increases efficiency of electrical systems by reducing losses
Extends the life of electrical equipment by reducing stress on the system
...
I have troubleshooted various issues on UPS systems, including battery failures, overload conditions, and faulty components.
Identifying and replacing faulty batteries
Checking and resetting overload protection
Testing and replacing faulty components such as capacitors or inverters
Transformers are electrical devices that transfer electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease voltage levels in electrical power transmission and distribution systems.
They consist of primary and secondary windings, a core made of ferromagnetic material, and insulation.
Examples of transformers include power transformers, distribution tran...
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges and learning opportunities
Seeking a more supportive work environment
Want to explore different industry sectors
Top trending discussions
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.
Regular inspection of tracks to identify and address corrosion early
Painting the tracks with corrosion-resistant coatings
Applying cathodic protection to prevent corrosion
Using corrosion-resistant materials in track construction
Implementing proper drainage systems to prevent w
Seeking new challenges and opportunities for growth.
Desire for career advancement
Looking for new challenges
Seeking better work-life balance
Relocation to a new area
Company downsizing or restructuring
Conflict with management or colleagues
I can join within 2 weeks of receiving a formal offer.
I will need to provide a notice period to my current employer.
I may need time to relocate if the job is in a different city.
I will need to finalize any pending commitments before joining.
I can start the onboarding process as soon as possible to expedite the joining date.
I appeared for an interview before Feb 2024.
Negotiated a 20% discount on a bulk order of office supplies.
Identified the need for a large order of office supplies
Researched prices from multiple vendors
Used data to negotiate a 20% discount with the chosen vendor
Ensured timely delivery of the supplies
I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.
Aptitude test was similar to Management Exams/ CAT.
Project Management involves planning, organizing, and overseeing the completion of a project within specific constraints.
CPM stands for Critical Path Method, a project management technique used to determine the longest sequence of dependent tasks and the shortest time needed to complete a project.
PERT stands for Program Evaluation and Review Technique, a project management tool used to analyze and represent the tasks i...
I applied via Company Website and was interviewed before Nov 2023. There were 2 interview rounds.
Seeking new challenges and growth opportunities in a dynamic work environment.
Looking for career advancement
Seeking new challenges and responsibilities
Interested in working in a different industry or with a different company
Want to learn new skills and gain diverse experience
Handled a case involving shipment delays due to customs issues and coordinated with various stakeholders to resolve the challenges.
Coordinated with customs officials to understand the root cause of delays
Worked closely with the logistics team to expedite the shipment process
Communicated regularly with the client to provide updates and manage expectations
Questions related to export import operations
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
I appeared for an interview in Nov 2016.
In 5 years, I see myself leading a team of engineers, implementing innovative solutions, and contributing to the growth of the organization.
Leading a team of engineers in executing projects
Implementing innovative solutions to improve efficiency
Contributing to the growth and success of the organization
based on 1 interview
Interview experience
Assistant Engineer
54
salaries
| ₹2.9 L/yr - ₹5.5 L/yr |
Junior Engineer
39
salaries
| ₹2 L/yr - ₹4.9 L/yr |
Engineer
28
salaries
| ₹4.4 L/yr - ₹8.5 L/yr |
Senior Engineer
17
salaries
| ₹6.5 L/yr - ₹11 L/yr |
Assistant Manager
14
salaries
| ₹6.8 L/yr - ₹14.5 L/yr |
Uflex
Huhtamaki
EPL Limited
Manjushree Technopack