Filter interviews by
I appeared for an interview before Dec 2020.
Top trending discussions
posted on 8 Apr 2021
I applied via Referral and was interviewed before Apr 2020. There was 1 interview round.
Power factor improvement involves reducing reactive power and increasing active power to improve efficiency.
Power factor is the ratio of active power to apparent power
Improving power factor reduces energy costs and improves system efficiency
Methods for improving power factor include capacitor banks, synchronous motors, and static VAR compensators
3-phase induction motor slip ring and squirrel cage motor differ in rotor construction and starting torque.
Slip ring motor has external resistors and brushes to control rotor current and torque, while squirrel cage motor has a simple rotor with copper bars.
Slip ring motor has high starting torque and is used in heavy load applications like cranes and elevators, while squirrel cage motor has low starting torque and is u...
Slip ring motors use external resistors for starting and speed control, while squirrel cage motors rely on the number of poles and frequency for speed control.
Slip ring motors have external resistors that are gradually removed to increase speed
Squirrel cage motors rely on the number of poles and frequency for speed control
Slip ring motors are used in applications where high starting torque is required
Squirrel cage moto...
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
The manufacturing process of the printing line involves various steps to produce printed materials efficiently.
Designing the layout of the printing line
Selecting the appropriate printing technology (e.g. offset, digital, flexography)
Calibrating and setting up the printing equipment
Testing the printing quality and making adjustments as needed
Implementing quality control measures throughout the process
posted on 20 Jan 2025
Optimize moisture content refers to adjusting the amount of moisture in a material to achieve the desired properties.
Optimizing moisture content involves finding the right balance to enhance the quality and performance of a material.
It is important in industries like agriculture, food processing, and construction.
For example, in agriculture, optimizing moisture content in soil can improve crop growth and yield.
Types of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type used in construction.
White cement is used for architectural purposes and to create colored concrete.
Rapid hardening cement sets quickly and is used in projects with tight deadlines.
Low heat cement generates less heat during hydration and is used in large concrete structures.
I appeared for an interview in Apr 2022.
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
The parts of an inverter include DC input, power transistors, transformer, output filter, and control circuit.
DC input: where the direct current is supplied to the inverter
Power transistors: responsible for converting DC to AC
Transformer: used to step up or step down the voltage
Output filter: smoothens the output waveform
Control circuit: manages the operation of the inverter
The formula for radiation of the day is based on the Stefan-Boltzmann law, which states that the total energy radiated per unit surface area of a black body is directly proportional to the fourth power of the body's absolute temperature.
Radiation of the day is calculated using the Stefan-Boltzmann law: P = σAT^4
P represents the power radiated per unit area, σ is the Stefan-Boltzmann constant, A is the surface area, and...
Challenges faced in previous plant and how they were overcome
One challenge was outdated equipment causing frequent breakdowns
Implemented a preventive maintenance schedule to address the issue
Another challenge was lack of skilled manpower
Conducted training programs and hired experienced technicians
Difficulty in meeting production targets due to inefficiencies
Implemented lean manufacturing principles to streamline proces
posted on 10 Feb 2022
I applied via Naukri.com and was interviewed before Feb 2021. There was 1 interview round.
based on 1 review
Rating in categories
Assistant Manager
4
salaries
| ₹8.4 L/yr - ₹10.5 L/yr |
Deputy Manager
3
salaries
| ₹8.2 L/yr - ₹11 L/yr |
Customer Care Executive
3
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Sterlite Power
Doosan Power Systems
Inox Wind
Gupta Power Infrastructure