I applied via Recruitment Consulltant and was interviewed in Dec 2021. There was 1 interview round.
posted on 15 Dec 2020
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
posted on 3 Jul 2021
posted on 18 Feb 2021
I applied via Walk-in and was interviewed before Feb 2020. There were 3 interview rounds.
Troubleshooting of solar plant involves identifying and resolving issues related to solar panels, inverters, and electrical systems.
Check for any physical damage or debris on solar panels
Inspect wiring and connections for any loose or damaged components
Test inverters and electrical systems for proper functioning
Monitor performance data to identify any anomalies
Consult manufacturer's manuals and technical support for gu...
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
The company culture is collaborative, innovative, and focused on continuous improvement.
Employees are encouraged to share ideas and work together to solve problems.
The company values creativity and rewards employees who come up with innovative solutions.
There is a strong emphasis on learning and development, with opportunities for training and career growth.
The company is committed to sustainability and social responsi...
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
Basic electrical questions.maths,english etc.
It was very easy ,duration 45 min for 30 questions
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
To protect a transformer, measures such as overcurrent protection, temperature monitoring, and proper grounding should be implemented. VFD stands for Variable Frequency Drive, a device used to control the speed of an electric motor.
Implement overcurrent protection to prevent excessive current flow through the transformer.
Monitor the temperature of the transformer using temperature sensors to prevent overheating.
Ensure ...
I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.
CT and PT are electrical transformers used in power systems to measure current and voltage respectively.
CT stands for Current Transformer and is used to measure high currents in power systems.
PT stands for Potential Transformer and is used to measure high voltages in power systems.
CTs are connected in series with the load while PTs are connected in parallel with the load.
CTs are used to measure current for protection a...
based on 2 reviews
Rating in categories
Deputy Associate
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
47
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
33
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Power Solar
Waaree Energies
Vikram Solar
Jakson Group