Asking each other's problems and there solution , and upcoming high standard procedure
NDT stands for Non-Destructive Testing, which is a method used to evaluate the properties of a material, component, or system without causing damage.
NDT techniques include visual inspection, ultrasonic testing, radiographic testing, magnetic particle testing, and dye penetrant testing.
The responsibility of NDT inspectors is to perform these tests to ensure the quality and integrity of materials and components.
They inte...
QC stands for Quality Control, which involves ensuring that products or services meet specified standards and requirements.
QC involves inspecting, testing, and evaluating products to ensure they meet quality standards
QC helps identify defects or deviations from specifications
QC involves implementing processes and procedures to maintain consistent quality
Examples: conducting visual inspections, performing measurements a
Inspection is the process of examining, testing, or evaluating something to determine its quality or condition.
Inspection involves carefully examining an item or product to ensure it meets specific standards or requirements.
It can include visual checks, measurements, testing, and documentation of results.
Examples of inspection in a QC role include checking dimensions of a part, verifying materials used, and testing fun...
Top trending discussions
Inspecting columns involves checking for dimensions, alignment, surface finish, and reinforcement.
Check dimensions using a measuring tape or caliper
Ensure alignment by using a level
Inspect surface finish for any cracks, chips, or unevenness
Check reinforcement by looking for proper placement and spacing of rebar
Hydrotest during maintenance involves filling the equipment with water or another liquid to check for leaks or structural integrity.
Ensure the equipment is properly prepared for the hydrotest, including cleaning and removing any debris.
Fill the equipment with water or another suitable liquid to the specified pressure level.
Monitor the equipment for any leaks or pressure drops during the test.
Record the results of the h...
Isometric drawings show a 3D object in a 2D format with all three dimensions represented equally.
Lines that are parallel in the 3D object will also be parallel in the isometric drawing
All three axes (x, y, z) are equally foreshortened
Angles between axes are 120 degrees
No vanishing points like in perspective drawings
To maintain staff during overwork, provide breaks, offer support, prioritize tasks, communicate openly, and reward hard work.
Provide regular breaks to prevent burnout
Offer support and resources to help manage workload
Prioritize tasks to ensure important deadlines are met
Communicate openly about expectations and challenges
Reward hard work with incentives or recognition
Inspecting columns involves checking for dimensions, alignment, surface finish, and reinforcement.
Check dimensions using a measuring tape or caliper
Ensure alignment by using a level
Inspect surface finish for any cracks, chips, or unevenness
Check reinforcement by looking for proper placement and spacing of rebar
Hydrotest during maintenance involves filling the equipment with water or another liquid to check for leaks or structural integrity.
Ensure the equipment is properly prepared for the hydrotest, including cleaning and removing any debris.
Fill the equipment with water or another suitable liquid to the specified pressure level.
Monitor the equipment for any leaks or pressure drops during the test.
Record the results of the h...
Isometric drawings show a 3D object in a 2D format with all three dimensions represented equally.
Lines that are parallel in the 3D object will also be parallel in the isometric drawing
All three axes (x, y, z) are equally foreshortened
Angles between axes are 120 degrees
No vanishing points like in perspective drawings
To maintain staff during overwork, provide breaks, offer support, prioritize tasks, communicate openly, and reward hard work.
Provide regular breaks to prevent burnout
Offer support and resources to help manage workload
Prioritize tasks to ensure important deadlines are met
Communicate openly about expectations and challenges
Reward hard work with incentives or recognition
I applied via Walk-in and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 3 interview rounds.
Training HV equipment’s
I applied via Referral and was interviewed before Dec 2021. There were 3 interview rounds.
1. What are the jointing procedures for HDPE pipe?
2. What are the minimum distance from the Equipment's to Fire hose reel?
3. What is the test pressure for fire water pipeline?
What is the reference aramco SAES standard for gaskets?
based on 2 interviews
Interview experience
Mechanical Technician
14
salaries
| ₹5.7 L/yr - ₹19.2 L/yr |
Field Operator
12
salaries
| ₹9 L/yr - ₹21.2 L/yr |
Electrical Technician
10
salaries
| ₹3.6 L/yr - ₹9 L/yr |
Instrumentation Technician
8
salaries
| ₹4.5 L/yr - ₹15 L/yr |
Lab Technician
6
salaries
| ₹12 L/yr - ₹30.5 L/yr |
Reliance Industries
Indian Oil Corporation
Bharat Petroleum
Hindustan Petroleum