Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aarvee Associates Team. If you also belong to the team, you can get access from here

Aarvee Associates Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Aarvee Associates Manager – Electrical Interview Questions and Answers

Updated 6 Jul 2019

Aarvee Associates Manager – Electrical Interview Experiences

1 interview found

I applied via Approached by Company and was interviewed in Dec 2018. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Go all through the technical which have been mentioned in resume. Along with keep basics always in mind. Talk gently but specifically. Do not directly deny a question but tell frankly that a particular que...
  • Q2. Always try to seek information about the company's assigned CTC amount for that position. Always give positive reviews about the past employers but state the reason to change as growth and learning new thi...

Interview Preparation Tips

General Tips: All the best.
Duration: 1-4 weeks

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. They asked about projects experience in construction and commissioning part

Interview Preparation Tips

Interview preparation tips for other job seekers - It was grate and very good experience to work with Shapoorji Pallonji, And they were appreciated me for successful completion project before deadline.

It's one of the best organization in my career and I thanks lot to Shapoorji entire EPC team.



Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Dec 2021. There were 2 interview rounds.

Round 1 - Aptitude Test 

Quant questions, logical questions, Time and series Questions.

Round 2 - Technical 

(2 Questions)

  • Q1. 1. Electrical Basics level question, SLD for Distribution system.
  • Q2. Electrical Load calculation for Construction works.
  • Ans. 

    Electrical load calculation is crucial for construction works to ensure proper electrical system design and prevent overloading.

    • Determine the total connected load of all electrical equipment and appliances

    • Calculate the demand load based on the expected usage of the equipment and appliances

    • Consider diversity factors to account for the likelihood of all equipment being used simultaneously

    • Add safety factors to ensure the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and put positive efforts, say no in case not know. Don’t hesitate to say no rather than bluffing.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Transformer Testing
  • Q2. Transformer Protection

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview focuses on Technical and previous experiences.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions, and previous company experience
Round 3 - One-on-one 

(7 Questions)

  • Q1. Technical questions, previous company experience
  • Q2. Concrete grade, site management
  • Q3. Site execution questions
  • Q4. Shuttering , reinforcement questions
  • Q5. Concrete grades ,qty taken
  • Q6. Finishing works Tiles ,granite plastering
  • Q7. Block work and finishing works

Interview Preparation Tips

Interview preparation tips for other job seekers - Improve technical knowledge and site management

I applied via Naukri.com and was interviewed before May 2020. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. About planning scheduling costing budgeting of water supply projects
  • Q2. How soon can you join
  • Ans. 

    I can join within two weeks.

    • I am currently serving a two-week notice period at my current job.

    • I have already completed all necessary paperwork and background checks.

    • I am ready to start as soon as possible.

    • I can adjust my start date based on the company's requirements.

  • Answered by AI
  • Q3. Process of recruitment is too lengthy
  • Q4. Three rounds conducted
  • Q5. Why did you left last company
  • Ans. 

    I left my last company to pursue new opportunities and challenges.

    • Seeking growth and advancement in my career

    • Looking for a company with a better cultural fit

    • Wanting to broaden my skill set

    • Desire for a higher level of responsibility

    • Company downsizing or restructuring

  • Answered by AI
  • Q6. Relation with previous bosses

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer very clearly honestly and politly

I applied via Approached by Company and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Equipment layout details
  • Q2. Plot plan details and man and material movement path

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge on piping system, thickness calculations and materials are required

Equipment layout preparation as per oisd 118 and plot plan knowledge required.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was just a aptitude test

Round 2 - Technical 

(2 Questions)

  • Q1. Basic regarding professional area
  • Q2. Project worked at and experienced
  • Ans. 

    Managed a team to implement a new customer relationship management system

    • Led a team of 5 employees to successfully implement a new CRM system

    • Coordinated with IT department to ensure smooth integration of the system

    • Provided training to staff on how to use the new system effectively

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Why i want to join the firm
  • Ans. 

    I want to join the firm because of its strong reputation, opportunities for growth, and alignment with my career goals.

    • Strong reputation in the industry

    • Opportunities for career growth and development

    • Alignment with my career goals and values

  • Answered by AI
  • Q2. Salary discussions

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Excavation safety, EHS management, Lifting & Erection safety

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to explain basic concepts clearly

Aarvee Associates Interview FAQs

How to prepare for Aarvee Associates Manager – Electrical interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Aarvee Associates. The most common topics and skills that interviewers at Aarvee Associates expect are UPS.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 446 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Aarvee Associates Manager – Electrical Salary
based on 4 salaries
₹5.1 L/yr - ₹8.2 L/yr
47% less than the average Manager – Electrical Salary in India
View more details

Aarvee Associates Manager – Electrical Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

4.0

Skill development

5.0

Work-life balance

3.0

Salary

5.0

Job security

5.0

Company culture

3.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
326 salaries
unlock blur

₹3.6 L/yr - ₹11 L/yr

Manager
119 salaries
unlock blur

₹6.5 L/yr - ₹19 L/yr

Field Engineer
119 salaries
unlock blur

₹1.6 L/yr - ₹4.2 L/yr

Site Engineer
93 salaries
unlock blur

₹2.7 L/yr - ₹6.6 L/yr

Civil Engineer
84 salaries
unlock blur

₹2.7 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Aarvee Associates with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview