Senior Civil Site Engineer
Senior Civil Site Engineer Interview Questions and Answers for Freshers
Q1. In which part of column bending moment will be zero
In the middle of the column
Bending moment will be zero at the midpoint of a column
This is because the bending moment is a maximum at the base and decreases linearly towards the top
At the midpoint, the bending moment changes direction from positive to negative
Q2. How much self weight of the steel?
The self weight of steel depends on its density and volume.
The self weight of steel is determined by its density, which is typically around 7850 kg/m^3.
To calculate the self weight of steel, multiply its density by its volume.
The volume of steel can be calculated by multiplying its length, width, and height.
For example, if a steel beam has a length of 5 meters, width of 0.3 meters, and height of 0.5 meters, its volume would be 0.075 cubic meters.
Multiplying the volume by the ...read more
Q3. Cement required for one metre cubic RCC work
The amount of cement required for one cubic meter of RCC work depends on the mix ratio and design requirements.
The mix ratio determines the proportion of cement in the concrete mix.
The design requirements consider factors like strength, durability, and workability.
The cement quantity can be calculated using the formula: (cement content per unit volume) x (total volume of concrete).
Q4. Why lapping is not provided at same point
Lapping is not provided at the same point to ensure structural integrity and avoid weak points in the construction.
Lapping is the overlapping of two reinforcement bars to ensure continuity and strength in the structure.
Providing lapping at the same point can create a weak point due to the concentration of stress in one area.
Lapping at different points distributes the load evenly and enhances the overall structural integrity.
Following proper lapping guidelines as per structura...read more
Q5. What is minimum value of lapping
The minimum value of lapping is typically specified in construction codes and standards to ensure structural integrity.
The minimum value of lapping is usually determined by the diameter of the reinforcement bars being used.
It is important to follow the specifications provided by the construction codes and standards to ensure the structural integrity of the building.
For example, in reinforced concrete construction, the minimum lapping length for reinforcement bars is often spe...read more
Q6. Why pcc is provided before foundation
PCC is provided before foundation to create a level and stable surface for the foundation to be built upon.
PCC (Plain Cement Concrete) helps in distributing the load of the foundation evenly.
It prevents direct contact between foundation and soil, reducing the risk of soil erosion.
PCC provides a smooth and level surface for the foundation to be constructed on, ensuring stability and durability.
It helps in preventing water from seeping into the foundation, reducing the risk of ...read more
Share interview questions and help millions of jobseekers 🌟
Q7. Why stirrups are provided alternate hook
Stirrups are provided alternate hook to improve the bond between the stirrups and the concrete.
Alternate hooking of stirrups helps in distributing the load more evenly along the length of the stirrups.
It also helps in preventing the stirrups from slipping out of position during concrete pouring and compaction.
The alternate hooking pattern increases the shear strength of the stirrups and enhances the overall structural integrity of the concrete element.
This practice is commonl...read more
Senior Civil Site Engineer Jobs
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month