Q1. How check of concrete quality in RMC plant without any instruments as per requirement is code.
Concrete quality in RMC plant can be checked without instruments as per requirement is code.
Visual inspection of concrete consistency and color
Slump test to check workability
Sampling and testing of concrete cubes for compressive strength
Checking for air content in concrete
Verification of mix design and proportions
Monitoring of curing process
Adherence to relevant IS codes and standards
Q2. How many hours taken of time for pile Bouring.
The number of hours taken for pile boring depends on various factors such as soil type, depth, diameter, equipment used, etc.
The time taken for pile boring can range from a few hours to several days depending on the project requirements.
Factors such as soil type, depth, diameter, and equipment used can significantly impact the time taken for pile boring.
For instance, drilling through hard rock can take longer than drilling through soft soil.
Similarly, using a larger diameter ...read more
Q3. How conciliation of Bitumen in Road work.
Conciliation of bitumen in road work involves proper mixing and testing to ensure quality and durability.
Properly mix bitumen with aggregates to achieve desired consistency
Conduct tests to ensure proper viscosity and adhesion properties
Ensure proper temperature during mixing and laying of bitumen
Use additives to improve the quality and durability of the road surface
Regular maintenance and repair to prevent deterioration
Q4. How calculated of level sheet as per requirement
Level sheet is calculated based on project requirements and specifications.
Level sheet is calculated by determining the elevation of the ground and the desired elevation of the finished surface.
The difference between the two elevations is the depth of excavation required.
Calculations should take into account any slope or gradient requirements.
The level sheet should be regularly updated and checked against the project specifications.
Software programs such as AutoCAD or Civil 3...read more
Q5. How many hours concrete rejected as per is code,
Concrete rejection hours as per IS code
As per IS code, rejected concrete should be removed within 24 hours
If the rejected concrete is not removed within 24 hours, it should be retested before use
IS code also specifies that rejected concrete should not be reused without proper testing
Qa Qc Civil Manager Jobs
0Interview Questions of Similar Designations
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month