Piping Layout Engineer

Piping Layout Engineer Interview Questions and Answers

Updated 9 Aug 2024

Q1. Past experience explanation, equipment data sheet explanation, which key points you checked in isometrics drawing

Ans.

I have extensive experience in reviewing equipment data sheets and isometrics drawings for piping layout engineering projects.

  • Reviewed equipment data sheets to ensure all necessary information and specifications are included

  • Checked isometrics drawings for accuracy in dimensions, materials, and connections

  • Verified that piping layout aligns with project requirements and standards

  • Ensured proper support and clearance for piping systems

  • Coordinated with other disciplines to resolve...read more

Q2. Interconnection diagram used for rack design, draw pump suction and discharge and modify it for different scenarios. , codes used for tank farm design

Ans.

Interconnection diagrams are used for rack design to show pump suction and discharge connections, and codes are used for tank farm design.

  • Interconnection diagrams show how equipment is connected in a system

  • Pump suction and discharge connections are typically shown with arrows indicating flow direction

  • Modifying the diagram for different scenarios may involve changing pipe sizes, valve types, or equipment locations

  • Codes used for tank farm design may include API standards, ASME ...read more

Q3. Sp3d modelling tool test for pump suction and discharge line modelling

Ans.

SP3D modelling tool is used to test pump suction and discharge line modelling.

  • SP3D is a software used for 3D modelling in piping design

  • To model pump suction and discharge lines, create equipment in SP3D and connect pipes accordingly

  • Ensure correct sizing, routing, and support for the lines

  • Consider factors like flow rate, pressure, and material compatibility

Q4. What is expected CTC?

Ans.

Expected CTC depends on factors like experience, skills, location, and company size.

  • Expected CTC can vary based on the candidate's experience level - entry-level, mid-level, or senior-level.

  • Skills and certifications can also impact the expected CTC - specialized skills may command higher salaries.

  • Location plays a significant role in determining CTC - salaries in metropolitan areas are usually higher.

  • Company size and industry can also influence the expected CTC - larger compan...read more

Frequently asked in,
Are these interview questions helpful?

Q5. What is success

Ans.

Success is achieving goals and fulfilling one's potential through hard work and determination.

  • Success is subjective and can vary from person to person.

  • It is not just about reaching a specific goal, but also about personal growth and fulfillment.

  • Success often involves overcoming challenges and obstacles.

  • It can be measured by factors such as happiness, fulfillment, and impact on others.

  • Examples of success can include getting a promotion at work, completing a marathon, or starti...read more

Piping Layout Engineer Jobs

PDP SP3D Piping Layout Engineer 9-14 years
Bechtel
4.0
Kolkata
Piping Layout Engineer - 1 year Contract 5-10 years
Black Veatch Consulting
4.3
Mumbai
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.1
 • 107 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Piping Layout Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter