MEP Site Engineer

MEP Site Engineer Interview Questions and Answers

Updated 15 Mar 2024

Q1. What is the centre level and top level of WC

Ans.

Centre level of WC is the level of the waste pipe connection and top level is the finished floor level of the WC.

  • Centre level of WC is the level at which the waste pipe connection is made.

  • Top level of WC is the finished floor level of the WC.

  • Centre level is important for proper installation of plumbing fixtures.

  • Top level is important for determining the height of the WC and other fixtures in relation to the finished floor.

Q2. How much current be in lighting arrestor

Ans.

The current in a lighting arrestor depends on the specific design and rating of the device.

  • The current in a lighting arrestor is typically measured in kiloamperes (kA).

  • The current rating of a lighting arrestor is determined by the manufacturer and should be specified in the product documentation.

  • The current in a lighting arrestor is designed to safely divert lightning strikes away from the protected equipment or structure.

  • It is important to ensure that the lighting arrestor i...read more

Q3. How many types of PVC Pipes

Ans.

There are mainly two types of PVC pipes: rigid PVC pipes and flexible PVC pipes.

  • Rigid PVC pipes are used for water supply, drainage, and irrigation systems.

  • Flexible PVC pipes are used for electrical conduits, cable protection, and ventilation systems.

Q4. How can handle site?

Ans.

Handling a site requires effective communication, organization, and problem-solving skills.

  • Establish clear communication channels with all stakeholders

  • Create and maintain a detailed project schedule

  • Regularly inspect the site for safety and quality control

  • Address any issues or conflicts promptly and professionally

  • Ensure all necessary permits and documentation are in order

  • Manage resources effectively to stay within budget

  • Stay up-to-date with industry regulations and best practi...read more

Are these interview questions helpful?

Q5. Difference between RCCB & ELCB

Ans.

RCCB is used to protect against earth faults, while ELCB is used to protect against earth leakage currents.

  • RCCB stands for Residual Current Circuit Breaker and protects against earth faults by detecting the difference in current flow between live and neutral wires.

  • ELCB stands for Earth Leakage Circuit Breaker and protects against earth leakage currents by detecting any current leakage to earth.

  • RCCB is more sensitive and can detect smaller current imbalances, while ELCB is les...read more

MEP Site Engineer Jobs

Mep Site Engineer 8-10 years
Dainik Bhaskar Group
4.3
₹ 7 L/yr - ₹ 9 L/yr
Jaipur
Mep Site Engineer 5-8 years
Som Project
3.8
₹ 3 L/yr - ₹ 5 L/yr
Pune
Mep Site Engineer 8-10 years
K V Developers Private Limited
3.8
Greater Noida
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

MEP Site Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter