Junior Site Engineer
Junior Site Engineer Interview Questions and Answers for Freshers
Q1. Why tiles are layed following the arrows behind the tiles
Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.
Arrows indicate the direction in which the pattern on the tiles should be aligned.
Following the arrows helps maintain consistency in the pattern layout.
It ensures that the tiles are installed in the correct orientation for a visually appealing finish.
Q2. What is the working mechanism of a power system?
A power system generates, transmits, and distributes electrical energy to consumers efficiently and reliably.
Generation: Power plants convert various energy sources (e.g., coal, natural gas, renewables) into electrical energy.
Transmission: High-voltage transmission lines carry electricity over long distances to minimize energy loss.
Distribution: Substations reduce voltage levels for safe delivery to homes and businesses.
Control Systems: SCADA systems monitor and control the p...read more
Q3. How the tiles are layed and leveled
Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.
Spread adhesive on the surface evenly
Place tiles in desired pattern, starting from the center and working outwards
Use a spirit level to ensure tiles are level and flat
Make adjustments as needed to maintain levelness
Allow adhesive to dry before grouting the tiles
Junior Site Engineer Jobs
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month