Q1. Rate analysis how you done percentage you taken.

Ans.

Rate analysis is done by breaking down the cost of a project into various components and calculating the cost of each component as a percentage of the total cost.

  • Identify the various components of the project

  • Determine the cost of each component

  • Calculate the percentage of each component in relation to the total cost

  • Add up the percentages to ensure they equal 100%

  • Use the rate analysis to estimate the cost of future projects

Q2. What are the procedures of installation of a pile?

Ans.

Installation of a pile involves several procedures that must be followed carefully.

  • Site preparation and marking

  • Excavation of soil to the required depth

  • Insertion of pile into the hole

  • Pouring of concrete or grout into the hole

  • Curing of the concrete or grout

  • Cutting the pile to the required level

  • Testing the pile for load-bearing capacity

Q3. What is the working principle of motor?

Ans.

The working principle of a motor involves converting electrical energy into mechanical energy through electromagnetic induction.

  • Motors operate based on the principle of electromagnetic induction, where a current-carrying conductor in a magnetic field experiences a force.

  • This force causes the conductor to move, resulting in mechanical motion.

  • Different types of motors, such as DC motors, AC motors, and stepper motors, have variations in their working principles and construction...read more

Q4. What is the working principle of VFD?

Ans.

VFD stands for Variable Frequency Drive, which controls the speed of an AC motor by varying the frequency and voltage of the power supplied to it.

  • VFD converts fixed frequency AC power to variable frequency to control motor speed

  • It adjusts the voltage and frequency to match the motor's speed requirements

  • VFDs are commonly used in HVAC systems, pumps, conveyors, and other industrial applications

Are these interview questions helpful?

Q5. Estimate of the project?

Ans.

The estimated project timeline is 6 months.

  • Consider the scope of the project

  • Break down the tasks and estimate time for each

  • Factor in any potential delays or obstacles

  • Consult with team members and stakeholders

  • Use project management tools to track progress

  • Example: A website redesign project estimated at 6 months

Junior Engineer 1 Jobs

0
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

3.8
 • 2.9k Interviews
4.1
 • 820 Interviews
4.2
 • 172 Interviews
4.2
 • 94 Interviews
4.0
 • 70 Interviews
4.0
 • 67 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Junior Engineer 1 Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter