Junior Engineer 1
Junior Engineer 1 Interview Questions and Answers for Freshers
Q1. Rate analysis how you done percentage you taken.
Rate analysis is done by breaking down the cost of a project into various components and calculating the cost of each component as a percentage of the total cost.
Identify the various components of the project
Determine the cost of each component
Calculate the percentage of each component in relation to the total cost
Add up the percentages to ensure they equal 100%
Use the rate analysis to estimate the cost of future projects
Q2. What are the procedures of installation of a pile?
Installation of a pile involves several procedures that must be followed carefully.
Site preparation and marking
Excavation of soil to the required depth
Insertion of pile into the hole
Pouring of concrete or grout into the hole
Curing of the concrete or grout
Cutting the pile to the required level
Testing the pile for load-bearing capacity
Q3. What is the working principle of motor?
The working principle of a motor involves converting electrical energy into mechanical energy through electromagnetic induction.
Motors operate based on the principle of electromagnetic induction, where a current-carrying conductor in a magnetic field experiences a force.
This force causes the conductor to move, resulting in mechanical motion.
Different types of motors, such as DC motors, AC motors, and stepper motors, have variations in their working principles and construction...read more
Q4. What is the working principle of VFD?
VFD stands for Variable Frequency Drive, which controls the speed of an AC motor by varying the frequency and voltage of the power supplied to it.
VFD converts fixed frequency AC power to variable frequency to control motor speed
It adjusts the voltage and frequency to match the motor's speed requirements
VFDs are commonly used in HVAC systems, pumps, conveyors, and other industrial applications
Q5. Estimate of the project?
The estimated project timeline is 6 months.
Consider the scope of the project
Break down the tasks and estimate time for each
Factor in any potential delays or obstacles
Consult with team members and stakeholders
Use project management tools to track progress
Example: A website redesign project estimated at 6 months
Junior Engineer 1 Jobs
0Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month