Upload Button Icon Add office photos
filter salaries All Filters

309 Worley Jobs

Commissioning Engineer - Process

6-11 years

Mumbai, Navi Mumbai

1 vacancy

Commissioning Engineer - Process

Worley

posted 17d ago

Job Description

    Implementation of the Project safety management systems during the planning and execution of Pre-commissioning, Commissioning and Startup project phases, adapting them to the specific needs and unique risks
  • Responsible for HSSE performance for all personnel and facilities under their control
  • Participate in the development and implementation of detailed execution plan for non-energized, energized testing activities, including schedule and budget fully integrated with the project schedule and budget including:
  • System and sub-system scoping
  • Pre-Commissioning procedures
  • Commissioning procedures
  • System testing procedures
  • FAT & SAT coordination
  • Commissioning Raw materials, intermediates and spares list
  • Functional Loop checks of system Electrical
  • Function checking of actuated valves.
  • Redline AFC drawings
  • Facilitate test equipment calibration and certification verification
  • Assembling Loop Check field packages
  • Risk Management (system specific) and mitigations
  • Ensure compliance with engineering procedures, codes, standards & approved codes of practice
  • Review & approval of all Instrument engineering documents created by the contractor for commissioning.
  • Input to the Completions Management Tool (CMT) including review & approval of project specific ITR s. (Check Sheets).
  • Provide input into project plans and schedules, achievement of agreed schedule.
  • Develop Instrument I&C commissioning staff Mobilization Plan.
  • Promote safety and environmental awareness through inductions, training, inspection, and promotions
  • Assist in investigation all incidents/accidents and near misses and present reports accordingly.
  • Monitor the Contractor s Instrument equipment installation and pre-commissioning activities and ensure these are executed in accordance with the project HSE, technical specifications, quality standards and procedures defined in the contracts.
  • Monitor material and equipment delivery and ensure storage, preservation and maintenance are performed and recorded, in line with vendor requirements.
  • Review and comment on the Contractor s documents on Instrument equipment including method statements, ITPs, work procedures and practices.
  • Prepare relevant Electrical equipment/system commissioning/energization and testing procedures
  • Ensure that the Instrument pre-commissioning and commissioning activities are properly organized , scheduled and conducted in a structured and safe manner, to test and certify that the installed equipment/systems, comply with the agreed performance parameters indicated in the design documents and specifications.
  • Responsible for the I&C Commissioning team and to oversee training, competency, supervision, and de-mobilization of personnel.
  • Responsible for the safe and timely execution of all Commissioning activities and integration of these activities with both Project and Operations.
  • Interfacing and coordination with the DCS & Automation Commissioning Coordinator.
  • Proactive in the promotion of HSSE at site, supporting the Client Management Team and Client HSSE.
  • Responsible for the development and communication of the requirements and timing for Electrical materials, resources and external services for Commissioning and ensures these requirements are secured.
About You
To be considered for this role it is envisaged you will possess the following attributes:
  • T

Employment Type: Full Time, Permanent

Read full job description

Prepare for Commissioning Engineer roles with real interview advice

People are getting interviews at Worley through

(based on 74 Worley interviews)
Job Portal
Campus Placement
Referral
Company Website
Walkin
Recruitment Consultant
26%
22%
12%
12%
4%
1%
23% candidates got the interview through other sources.
High Confidence
?
High Confidence means the data is based on a large number of responses received from the candidates.

What people at Worley are saying

Commissioning Engineer salary at Worley

reported by 2 employees with 16-20 years exp.
₹34.4 L/yr - ₹44 L/yr
424% more than the average Commissioning Engineer Salary in India
View more details

What Worley employees are saying about work life

based on 976 employees
69%
80%
58%
99%
Flexible timing
Monday to Friday
No travel
Day Shift
View more insights

Worley Benefits

Free Transport
Health Insurance
Work From Home
Cafeteria
Job Training
Soft Skill Training +6 more
View more benefits

Compare Worley with

Jacobs Engineering Group

4.1
Compare

Fluor Corporation

4.3
Compare

Bechtel

4.0
Compare

McDermott International

4.3
Compare

TechnipFMC

4.0
Compare

Aker Solutions

4.0
Compare

Wood Group

3.7
Compare

Saipem

4.1
Compare

Petrofac

4.4
Compare

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Kalpataru Projects International

4.2
Compare

KEC International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare

Alstom Transportation

3.7
Compare

Tata Technologies

3.7
Compare

AECOM

4.3
Compare

Saint-Gobain

4.0
Compare

AtkinsRealis

4.0
Compare

Similar Jobs for you

Commissioning Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

10-14 Yrs

₹ 12-14 LPA

Commissioning Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

6-11 Yrs

₹ 8-13 LPA

Commissioning Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

10-14 Yrs

₹ 12-14 LPA

Instrument Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

7-12 Yrs

₹ 9-14 LPA

Instrument Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

10-14 Yrs

₹ 12-14 LPA

Commissioning Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

7-12 Yrs

₹ 9-14 LPA

Commissioning Engineer at WorleyParsons Sdn Bhd

Mumbai, Navi Mumbai

10-14 Yrs

₹ 12-14 LPA

Commissioning Engineer at Siemens Limited

Gurgaon / Gurugram

3-7 Yrs

₹ 5-9 LPA

Manager at Schneider Electric India Pvt. Ltd.

Mumbai

7-12 Yrs

₹ 9-14 LPA

Commissioning Engineer at Triangle Technologies Pvt. Ltd.

Navi Mumbai

3-6 Yrs

₹ 5-9 LPA

Worley Mumbai Office Location

View all
Andheri Office
RK Mandir Rd, Kondivita, Andheri East, Mumbai, Maharashtra 400059, India Andheri
View on map

Commissioning Engineer - Process

6-11 Yrs

Mumbai, Navi Mumbai

17d ago·via naukri.com

Digital Solutions Consultant II

2-6 Yrs

Mumbai

17hr ago·via naukri.com

Planner/Scheduler II

6-11 Yrs

Mumbai

17hr ago·via naukri.com

Piping Stress Engineer II

5-10 Yrs

Pune

4d ago·via naukri.com

Process Engineer I

2-8 Yrs

Mumbai

4d ago·via naukri.com

Process Engineer Level I

3-5 Yrs

Pune

4d ago·via naukri.com

Senior Piping Stress Engineer

10-18 Yrs

Mumbai

4d ago·via naukri.com

Process Engineer II

6-13 Yrs

Pune

4d ago·via naukri.com

Process Engineer Level I

2-8 Yrs

Pune

4d ago·via naukri.com

Process Engineer Level I

3-5 Yrs

Pune

4d ago·via naukri.com
write
Share an Interview