Filter interviews by
Top trending discussions
I faced a difficult situation when a critical project deadline was approaching and we encountered unexpected technical issues.
Technical issues arose during a critical project
Deadline was approaching
Had to find quick solutions to resolve the issues
Coordinated with team members to troubleshoot and fix the problems
Implemented contingency plans to ensure project completion on time
posted on 23 Apr 2022
I applied via Naukri.com
Checking knowledge and time consuming
posted on 3 Jul 2024
I applied via Job Portal
Contouring is a technique used in engineering and surveying to determine the elevation of points on a surface.
Contouring involves creating contour lines to represent points of equal elevation on a map or drawing.
These contour lines help visualize the shape and elevation changes of the land or surface being studied.
Contouring is commonly used in civil engineering, geology, geography, and environmental science.
An example...
The area covered by 1 lit. of paint depends on the type of paint, surface texture, and application method.
The coverage of paint is typically measured in square feet or square meters per liter.
Factors affecting coverage include the type of paint (e.g. primer, topcoat), surface porosity, and number of coats applied.
For example, a high-quality paint may cover around 350-400 square feet per gallon on a smooth surface, whil...
GSB stands for Granular Sub Base, the thickness of which depends on the specific project requirements and soil conditions.
Thickness of GSB is typically specified in project plans and can vary depending on the load-bearing requirements of the road or structure.
GSB thickness can range from a few inches to several feet, with the goal of providing a stable base for the construction above.
Factors such as soil type, traffic ...
Flexible pavement consists of multiple layers designed to distribute traffic loads and provide a smooth driving surface.
Flexible pavement typically consists of a subgrade, subbase, base course, and surface course.
The subgrade is the native soil underneath the pavement.
The subbase is a layer of aggregate material placed on top of the subgrade to improve drainage and provide additional support.
The base course is a layer ...
posted on 21 May 2023
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I appeared for an interview before Dec 2018.
Instructions for presenting on a specific topic involve thorough research, organization of key points, engaging visuals, and clear communication.
Research the topic thoroughly to ensure accurate information
Organize key points in a logical sequence to maintain audience interest
Use engaging visuals such as slides, videos, or props to enhance understanding
Practice clear and confident communication to effectively convey the...
posted on 19 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Officer
81
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
Executive
62
salaries
| ₹3.5 L/yr - ₹7.2 L/yr |
Senior Officer
61
salaries
| ₹3 L/yr - ₹5 L/yr |
Senior Executive
48
salaries
| ₹3.8 L/yr - ₹8.4 L/yr |
Assistant Manager
36
salaries
| ₹5.6 L/yr - ₹10.8 L/yr |
AstraZeneca
Otsuka Pharmaceutical India Private Limited
Flamingo Pharmaceuticals
Aimil Pharmaceuticals