Filter interviews by
I applied via Apna Jobs and was interviewed before Feb 2021. There was 1 interview round.
Top trending discussions
I applied via Referral and was interviewed before May 2023. There were 2 interview rounds.
To achieve production target within time and quality, proper planning, efficient resource allocation, continuous monitoring, and timely adjustments are essential.
Develop a detailed production plan outlining tasks, timelines, and resource requirements
Allocate resources effectively to ensure smooth workflow and minimize bottlenecks
Implement quality control measures at each stage of production to maintain high standards
Mo...
To manage scrap reduction while achieving production targets, it is important to implement efficient quality control measures and continuous improvement strategies.
Implementing strict quality control measures to identify and address root causes of scrap
Regularly analyzing production processes to identify areas for improvement
Training employees on proper production techniques and waste reduction strategies
Utilizing lean...
Maintain daily data by implementing data verification processes to improve efficiency and boost production.
Establish a system for daily data entry and storage
Regularly verify data for accuracy and completeness
Analyze data trends to identify areas for improvement
Implement changes based on data analysis to optimize processes and increase production
Utilize software tools for data management and analysis
Train employees on
I appeared for an interview in Feb 2025.
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 3 interview rounds.
PPAP submission is the final phase of APQP.
PPAP submission is the final step in the APQP process.
It involves submitting a Production Part Approval Process (PPAP) to the customer.
PPAP includes documentation and samples that demonstrate the product meets customer requirements.
PPAP submission is necessary before production can begin.
PPAP submission is a critical step in ensuring product quality and customer satisfaction.
APQP consists of five phases, with PPAP being submitted in the fourth phase.
APQP stands for Advanced Product Quality Planning.
The five phases of APQP are: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment, and Corrective Action.
PPAP stands for Production Part Approval Process.
PPAP is submitted in the fourth p...
To make a PPT, use a software like PowerPoint or Google Slides and follow a structure with clear and concise content.
Choose a template or create your own design
Add relevant and visually appealing images
Use bullet points and short sentences
Practice your presentation before presenting
Include a conclusion and call to action
Process audit involves reviewing and evaluating a company's procedures and policies to ensure they are effective and efficient.
Identify the process to be audited
Define the audit objectives and scope
Select the audit team and assign roles
Gather and analyze data
Identify areas for improvement
Develop and implement corrective actions
Monitor and follow up on corrective actions
Document the audit findings and recommendations
When a customer complaint arises, I listen attentively, empathize with their concerns, investigate the issue, propose a solution, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their concerns and show understanding
Investigate the issue by gathering relevant information
Propose a solution or offer alternatives to address the complaint
Follow up with the customer to ensure
Can you please clarify the question?
I'm sorry, I don't understand what you're asking.
Could you please rephrase the question?
I need more information to answer that question.
Gauges and fixtures should be developed during the design phase of NPD to ensure quality and efficiency.
Identify critical dimensions and tolerances early on
Develop gauges and fixtures to measure and verify these dimensions
Test and refine gauges and fixtures throughout the design process
Ensure gauges and fixtures are compatible with manufacturing processes
Finalize gauges and fixtures before production begins
I applied via Walk-in
Initial data required to build a Gear box
Design specifications and requirements
Type of gear system (e.g. spur, helical, bevel, etc.)
Power and torque requirements
Gear ratios and speed requirements
Material selection for gears and housing
Lubrication system design
Manufacturing and assembly processes
Quality control and testing procedures
The material chosen for the shaft and gear depends on factors such as load, speed, and operating conditions.
Consider the load and speed requirements of the shaft and gear.
Evaluate the operating conditions, such as temperature and corrosion resistance.
Common materials for shafts include steel, stainless steel, and titanium.
Common materials for gears include steel, cast iron, and bronze.
The material selection should ensu...
I applied via Recruitment Consultant and was interviewed in Aug 2020. There was 1 interview round.
The number of tillers that can be sold depends on market demand, production capacity, and competition.
Market demand is a key factor in determining the number of tillers that can be sold.
Production capacity also plays a role in determining the number of tillers that can be sold.
Competition from other companies selling tillers can impact sales.
Factors such as pricing, quality, and marketing strategies can also affect sal...
I applied via Walk-in and was interviewed in Aug 2021. There were 5 interview rounds.
M29 is a G-code used to stop writing to an SD card or other storage device.
M29 is used to end a file when writing to an SD card or other storage device.
It ensures that all data is written and prevents corruption of the file.
It is commonly used in CNC machines for drilling and tapping programs.
It can also be used for hole dialing and other precision operations.
M29 is often used in conjunction with other G and M codes to
I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.
I am currently earning $60,000 per year.
Current salary is $60,000 per year
Salary is subject to negotiation based on job responsibilities and benefits
Previous salary may not accurately reflect current market value
I have 5 years of experience in HVAC installation, maintenance, and repair.
I have worked in the HVAC industry for 5 years
Experience includes installation, maintenance, and repair of HVAC systems
Familiar with troubleshooting and problem-solving in HVAC systems
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Math electrical related
Assistant Manager
18
salaries
| ₹10 L/yr - ₹17 L/yr |
Senior Engineer
13
salaries
| ₹6 L/yr - ₹9 L/yr |
Associate Manager
9
salaries
| ₹14 L/yr - ₹20.5 L/yr |
Lead Engineer
7
salaries
| ₹9 L/yr - ₹12 L/yr |
Senior Executive
7
salaries
| ₹5.8 L/yr - ₹9 L/yr |
ZF Steering Gear
Dhoot Transmission
Amphenol Interconnect
Prama Hikvision India