i
Vitesco Technologies
Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
posted on 21 Nov 2023
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
Reasoning , MCQ, tecnical
I applied via Company Website and was interviewed before Apr 2022. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2022. There were 3 interview rounds.
Written test for aptitude
I applied via Walk-in and was interviewed in Feb 2021. There was 1 interview round.
posted on 16 Oct 2024
I applied via Walk-in and was interviewed in Sep 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 2 interview rounds.
The t code used for stock checking is MB52.
MB52 is a transaction code in SAP used for displaying warehouse stocks.
It provides information on stock quantity, value, and movement.
It can be used to check stock levels for a specific material or plant.
MB52 can also be used to display stock for a specific date range.
Bottleneck is a point in a process where the flow of work is limited or slowed down.
Bottlenecks can occur in any process, from manufacturing to software development.
They can be caused by a lack of resources, inefficient processes, or unexpected events.
Identifying and addressing bottlenecks is important for improving efficiency and productivity.
Examples of bottlenecks include a single machine in a production line that s...
Material storage status refers to the current condition and availability of materials in storage.
Material storage status includes information on the quantity, location, and condition of materials in storage.
This information is important for inventory management and ensuring that materials are available when needed.
Material storage status can be tracked using inventory management software or manual record-keeping.
Exampl...
based on 10 reviews
Rating in categories
Lead Engineer
160
salaries
| ₹7 L/yr - ₹19.6 L/yr |
Associate Architect
126
salaries
| ₹9.4 L/yr - ₹26.2 L/yr |
Junior Engineer
39
salaries
| ₹1.8 L/yr - ₹4.1 L/yr |
Engineer
32
salaries
| ₹5 L/yr - ₹13 L/yr |
Production Engineer
31
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Bharat Forge
Samvardhana Motherson Group
Bosch
Mahindra Last Mile Mobility