I appeared for an interview before Feb 2024.
Basics of anatomy ans and chemistry
posted on 9 Apr 2021
I applied via Recruitment Consultant and was interviewed before Apr 2020. There were 4 interview rounds.
The power of a pump can be calculated using the formula: Power = (Flow rate x Head) / Efficiency
The power of a pump is determined by the flow rate, head, and efficiency
Flow rate is the volume of fluid passing through the pump per unit time
Head is the height difference between the inlet and outlet of the pump
Efficiency is the ratio of the actual power output to the power input
The formula to calculate power is: Power = (...
Air flow in HVAC ducting can be calculated using the formula Q = AV
Q = air flow rate in cubic feet per minute (CFM)
A = cross-sectional area of the duct in square feet
V = air velocity in feet per minute (FPM)
Air velocity can be measured using a pitot tube or an anemometer
Duct sizing and layout can affect air flow and should be considered in calculations
A reactor can be installed by following a few steps.
Choose a suitable location for the reactor
Prepare the foundation for the reactor
Install the reactor vessel and associated equipment
Connect the piping and electrical systems
Test the reactor for proper functioning
Commissioning of a reactor involves a series of tests and procedures to ensure safe and efficient operation.
Pre-commissioning checks and inspections
Functional testing of equipment and systems
Testing of safety systems
Fuel loading and reactor startup
Performance testing and optimization
Final acceptance testing
Documentation and training
Regulatory approval
Examples: Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR
Condensers are used to convert high-pressure vapor into liquid form.
Condensers are used in various industries such as power plants, refrigeration systems, and chemical processing plants.
They help in increasing the efficiency of the system by reducing the pressure and temperature of the vapor.
They also help in recovering valuable materials from the vapor, such as water in a power plant.
Examples of condensers include she...
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Dec 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Nov 2022. There was 1 interview round.
I am highly adaptable and able to quickly adjust to new situations and challenges.
I have experience working on a variety of projects with different requirements and constraints.
I am able to switch between different tasks and priorities efficiently.
I am open to learning new skills and technologies to stay current in the field.
I can easily collaborate with team members from diverse backgrounds and disciplines.
I am comfor...
I led a team in developing a new product line, increasing company revenue by 20%.
Led a team in developing a new product line
Increased company revenue by 20%
Implemented cost-saving measures in production process
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
Executive
268
salaries
| ₹1.5 L/yr - ₹5.7 L/yr |
Research Associate
141
salaries
| ₹1.4 L/yr - ₹5.1 L/yr |
Senior Executive
112
salaries
| ₹2.7 L/yr - ₹8 L/yr |
Assistant Manager
49
salaries
| ₹5 L/yr - ₹9.5 L/yr |
Operator
43
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Hetero
Micro Labs
Biological E
USV