Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by VIKRAN Engineering & Exim Team. If you also belong to the team, you can get access from here

VIKRAN Engineering & Exim Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

VIKRAN Engineering & Exim Senior Accounts Executive Interview Questions and Answers

Updated 11 Feb 2022

VIKRAN Engineering & Exim Senior Accounts Executive Interview Experiences

1 interview found

Round 1 - Technical 

(2 Questions)

  • Q1. About T/B, B/S, MIS, Budget
  • Q2. About Supply & Erection Billing Process
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. What are your strengths and weaknesses?
  • Q5. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview preparation should be high.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions
Round 3 - Technical 

(1 Question)

  • Q1. Basics of strength of material

I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain compressor troubleshooting
  • Ans. 

    Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.

    • Check for leaks in the system

    • Inspect the compressor for damage or wear

    • Check the electrical connections and wiring

    • Monitor the pressure and temperature readings

    • Clean or replace air filters

    • Check the oil level and quality

    • Inspect the belts and pulleys for wear or damage

  • Answered by AI
  • Q2. Prespare well and before interview make sure

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and all types mechanical equipment

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Electrical Construction Free Commissioning Activity
  • Q2. HV..MV..VSD.AFD.MCC.LV UPS.PP.PDP..LP..ELP Cable Meggering laying & glanding Termination. Testing equipments Motor Solo run testing
  • Q3. Earth pit testing free commissioning
  • Q4. Motor Solo Run Testing

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical Cunstruction Free commissioning Activity

I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - One-on-one 

(4 Questions)

  • Q1. How can do surveyor work?
  • Ans. 

    Surveyors measure and map land, airspace, and water features to determine property boundaries and prepare construction sites.

    • Surveyors use specialized equipment such as GPS, total stations, and drones to collect data.

    • They analyze the data to create maps, legal descriptions, and other documents.

    • Surveyors work in various industries including construction, engineering, and government.

    • They must have knowledge of math, phys...

  • Answered by AI
  • Q2. How can do detail surveyor?
  • Ans. 

    To do a detailed survey, a surveyor must use precise instruments and techniques to accurately measure and record data.

    • Use high-precision instruments such as total stations and GPS receivers

    • Take multiple measurements to ensure accuracy

    • Record data in a clear and organized manner

    • Consider environmental factors that may affect measurements

    • Collaborate with other professionals to ensure comprehensive data collection

    • Use softwa...

  • Answered by AI
  • Q3. How can do layout and line level check?
  • Ans. 

    Layout and line level check can be done using various tools and techniques.

    • Use a theodolite or total station to measure angles and distances accurately.

    • Use a level to ensure that the ground is level and the lines are straight.

    • Use string lines and pegs to mark out the layout of the site.

    • Check the measurements and levels regularly to ensure accuracy.

    • Make adjustments as necessary to ensure that the layout and lines are co

  • Answered by AI
  • Q4. What is surveyor work ?
  • Ans. 

    Surveyor work involves measuring and mapping land, buildings, and other physical features.

    • Using specialized equipment to take precise measurements

    • Creating maps and drawings to represent the data collected

    • Working with architects, engineers, and construction teams

    • Ensuring compliance with local regulations and laws

    • Surveying land for potential development or construction projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My name is dinesh Shrestha i from Gorkha in Nepal i am surveyor cuntiune surveyor work 2 year .now surveyor work .thank you.

Skills evaluated in this interview

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is your name and designation
  • Q2. Where are you from and
Round 2 - One-on-one 

(1 Question)

  • Q1. Who is the ceo of abc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and rock the interview with good communication skills.do not stumble on ypur answers
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Difference between delete, drop, truncate
  • Ans. 

    Delete, drop, and truncate are SQL commands for removing data, but they differ in scope and behavior.

    • DELETE: Removes specific rows based on a condition. Example: DELETE FROM users WHERE age < 18;

    • DROP: Removes entire tables or databases. Example: DROP TABLE users;

    • TRUNCATE: Removes all rows from a table but keeps the structure. Example: TRUNCATE TABLE users;

  • Answered by AI
  • Q2. Queries on joins
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude ,logical reasoning and quant aptitude

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Design tinyurl system design

VIKRAN Engineering & Exim Interview FAQs

How many rounds are there in VIKRAN Engineering & Exim Senior Accounts Executive interview?
VIKRAN Engineering & Exim interview process usually has 2 rounds. The most common rounds in the VIKRAN Engineering & Exim interview process are Technical and HR.
What are the top questions asked in VIKRAN Engineering & Exim Senior Accounts Executive interview?

Some of the top questions asked at the VIKRAN Engineering & Exim Senior Accounts Executive interview -

  1. About Supply & Erection Billing Proc...read more
  2. About T/B, B/S, MIS, Bud...read more

Tell us how to improve this page.

VIKRAN Engineering & Exim Senior Accounts Executive Salary
based on 6 salaries
₹4 L/yr - ₹6 L/yr
At par with the average Senior Accounts Executive Salary in India
View more details

VIKRAN Engineering & Exim Senior Accounts Executive Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

-

Skill development

-

Work-life balance

-

Salary

-

Job security

-

Company culture

-

Promotions

-

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
61 salaries
unlock blur

₹3.2 L/yr - ₹8.1 L/yr

Assistant Manager
44 salaries
unlock blur

₹5.2 L/yr - ₹10.3 L/yr

Engineer
43 salaries
unlock blur

₹2 L/yr - ₹6.2 L/yr

Deputy Manager
28 salaries
unlock blur

₹7.5 L/yr - ₹12.6 L/yr

Site Engineer
23 salaries
unlock blur

₹2.5 L/yr - ₹4.4 L/yr

Explore more salaries
Compare VIKRAN Engineering & Exim with

ABCI Infrastructures

3.4
Compare

The Louis Berger Group

4.3
Compare

Nesma & Partners

4.3
Compare

El Seif Engineering Contracting

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview