Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
User stories are created by identifying user needs and defining the desired outcome in a concise and specific manner.
Identify user needs through research and analysis
Define the desired outcome in a concise and specific manner
Use the format 'As a [user], I want [goal], so that [reason]'
Prioritize user stories based on importance and feasibility
Scrum ceremonies attended by Product Owner
Sprint Planning: Collaborate with the team to plan the upcoming sprint
Daily Stand-up: Provide updates on progress and address any blockers
Sprint Review: Demonstrate completed work to stakeholders and gather feedback
Sprint Retrospective: Reflect on the sprint and identify areas for improvement
Backlog Refinement: Collaborate with the team to refine and prioritize backlog items
Omnichannel retailing is a strategy that integrates all sales channels to provide a seamless shopping experience.
Omnichannel retailing involves integrating all sales channels, including physical stores, online stores, mobile apps, social media, etc.
The goal is to provide a seamless shopping experience for customers, regardless of the channel they use.
To ensure consistency, retailers need to have a centralized inventory...
User stories and AC are written by understanding user needs and defining acceptance criteria.
Gather requirements from stakeholders and prioritize them
Write user stories in a simple, concise format
Define acceptance criteria to ensure the story is complete
Collaborate with development team to refine and estimate stories
Example: As a user, I want to be able to search for products by category so that I can easily find what ...
AC defines the scope of a user story while DoD defines the quality criteria for the completed work.
AC specifies what needs to be done to complete a user story
DoD specifies the quality criteria that must be met for the work to be considered complete
AC is used to determine if a user story is complete
DoD is used to determine if the work is done and ready for release
AC is written from the perspective of the user
DoD is writ...
Definition of Ready is the criteria that a user story must meet before it can be accepted into a sprint, while Definition of Done is the criteria that a user story must meet before it can be considered complete.
Definition of Ready ensures that the user story is well-defined, understood, and testable.
Definition of Done ensures that the user story meets the team's quality standards and is ready for release.
Definition of ...
Prioritization techniques for arranging backlog items
Using the MoSCoW method to categorize items as Must have, Should have, Could have, and Won't have
Using the Kano model to classify items as Basic, Performance, and Excitement
Using the Value vs. Effort matrix to prioritize items based on their value and effort required
Using the Cost of Delay to prioritize items based on the cost of delaying their implementation
Collabor...
I listen to all stakeholders, identify common goals, and find a compromise that satisfies everyone.
Listen to all stakeholders' concerns and perspectives
Identify common goals and priorities
Find a compromise that satisfies everyone
Communicate the decision and rationale clearly
Document the decision and revisit if necessary
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 4 interview rounds.
Top trending discussions
I appeared for an interview before Jul 2023.
Negotiable based on experience and responsibilities
Salary expectations are dependent on the specific role, responsibilities, and industry standards
Consider factors such as location, company size, and benefits package when determining salary expectations
Research average salaries for similar positions in the industry to have a realistic expectation
I applied via Walk-in and was interviewed in Apr 2020. There were 5 interview rounds.
Maintain employee work by setting clear expectations, providing feedback, recognizing achievements, and offering growth opportunities.
Set clear expectations and goals for each employee
Provide regular feedback and coaching to help employees improve
Recognize and reward achievements to motivate employees
Offer growth opportunities such as training and development programs
Create a positive work environment that fosters coll
posted on 21 Feb 2025
I appeared for an interview in Jan 2025.
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
I appeared for an interview in Feb 2025.
posted on 7 May 2021
I applied via Campus Placement and was interviewed in Nov 2020. There were 5 interview rounds.
Sets are unordered collections of unique elements while lists are ordered collections of elements.
Sets do not allow duplicate elements while lists do.
Sets do not maintain the insertion order while lists do.
Sets have faster lookup time for specific elements while lists have faster iteration time.
Examples of sets in Java include HashSet and TreeSet while examples of lists include ArrayList and LinkedList.
Finally block is used to execute code after try-catch block, regardless of whether an exception is thrown or not.
Finally block is optional and follows the catch block.
It is used to clean up resources like closing files, database connections, etc.
Finally block is executed even if an exception is not caught.
It is used to ensure that a certain piece of code is always executed.
Example: try { //code } catch (Exception e) { ...
posted on 9 Nov 2019
I applied via Company Website and was interviewed in Oct 2019. There were 5 interview rounds.
based on 2 interviews
Interview experience
Senior Software Engineer
51
salaries
| ₹20 L/yr - ₹35 L/yr |
Software Engineer
43
salaries
| ₹11.5 L/yr - ₹21 L/yr |
Product Manager
37
salaries
| ₹14.5 L/yr - ₹35.8 L/yr |
Analyst
17
salaries
| ₹8 L/yr - ₹16.5 L/yr |
Automation Test Engineer
16
salaries
| ₹12 L/yr - ₹20 L/yr |
Foray Software
JK Tech
Black Knight
Iksula