i
Vesuvius
Filter interviews by
Be the first one to contribute and help others!
I applied via Naukri.com and was interviewed before May 2020. There were 6 interview rounds.
To calculate departmental objectives and targets, a thorough analysis of past performance and future projections is necessary.
Review past performance data to identify areas of improvement
Set specific, measurable, achievable, relevant, and time-bound (SMART) objectives
Identify key performance indicators (KPIs) to track progress towards objectives
Develop action plans to achieve objectives and targets
Regularly monitor and...
Positive thinking is the mindset of focusing on the good and optimistic aspects of a situation.
Positive thinking involves having a positive attitude and outlook on life.
It is about finding the silver lining in difficult situations.
Positive thinking helps in maintaining motivation and resilience.
It involves reframing negative thoughts into positive ones.
Positive thinking can lead to improved mental and physical well-bei...
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
I applied via Referral and was interviewed before Sep 2022. There were 4 interview rounds.
Technical by top management
posted on 6 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
posted on 2 Oct 2021
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 1 Mar 2025
About sales and personal info
I appeared for an interview in Sep 2021.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
Preventive maintenance is a proactive approach to maintenance that involves regular inspections and repairs to prevent equipment failure.
Preventive maintenance involves scheduled inspections and repairs to prevent equipment failure
It is a proactive approach to maintenance that reduces downtime and extends equipment life
Examples include changing oil and filters, cleaning equipment, and replacing worn parts
Preventive mai...
Panel preventive maintenance is the regular inspection and servicing of electrical panels to ensure their proper functioning.
It involves checking for loose connections, damaged components, and signs of wear and tear.
Cleaning the panels and removing any debris or dust that may have accumulated.
Testing the panels to ensure they are functioning properly and addressing any issues that are found.
Examples include checking th...
based on 1 review
Rating in categories
Applications Engineer
137
salaries
| ₹2.9 L/yr - ₹7 L/yr |
Assistant Manager
37
salaries
| ₹5.2 L/yr - ₹17.8 L/yr |
Senior Engineer
25
salaries
| ₹5.2 L/yr - ₹11.9 L/yr |
Manager
16
salaries
| ₹11 L/yr - ₹24.5 L/yr |
Engineering Manager
13
salaries
| ₹13.8 L/yr - ₹20.2 L/yr |
ABB
Tractors and Farm Equipment
Atlas Copco
Timken