Add office photos
Employer?
Claim Account for FREE

Vensa Infrastructure

4.2
based on 144 Reviews
Filter interviews by

Coforge Interview Questions and Answers

Updated 18 Sep 2024

Q1. How can u mange shuttering without removing supports under slab and pourstrip

Ans.

Shuttering can be managed without removing supports under slab and pourstrip by using adjustable props and beams.

  • Use adjustable props to support the slab and pourstrip while removing the shuttering.

  • Install beams to transfer the load from the slab to the props, allowing the supports to be removed.

  • Ensure proper alignment and spacing of props and beams to distribute the load evenly.

  • Regularly check and adjust the props and beams to maintain stability during the construction proce...read more

Add your answer

Q2. What checks do u do while doing in concrete and how will do in column and slab junction

Ans.

Checks in concrete include slump test, air content test, temperature monitoring. At column and slab junction, check for proper reinforcement placement, formwork alignment, and concrete pouring.

  • Perform slump test to ensure proper consistency of concrete

  • Check air content to ensure proper durability and workability

  • Monitor temperature to prevent issues like thermal cracking

  • At column and slab junction, check reinforcement placement for proper strength

  • Ensure formwork alignment to p...read more

Add your answer

Q3. What would happen if support removed at pourstrip

Ans.

The pourstrip is a critical component for support in quality control. Its removal could lead to potential issues in product packaging and quality assurance.

  • Loss of structural integrity in packaging

  • Increased risk of contamination or tampering

  • Difficulty in handling and storage of products

  • Potential impact on product shelf life and quality

  • Need for alternative support measures or redesign of packaging

Add your answer

Q4. When will do concreate in pourstrip

Ans.

Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking and ensure proper curing.

  • Concrete should be poured in pour strips after completing a certain section of formwork to prevent cracking.

  • Pour strips are typically used in large concrete pours to control the placement and curing of the concrete.

  • The timing of pour strips will depend on the size and complexity of the project, as well as the weather conditions.

  • For example, in a...read more

Add your answer
Discover Coforge interview dos and don'ts from real experiences

Q5. What is the current carrying capacity of 185sqmm al cable .

Ans.

The current carrying capacity of a 185sqmm al cable depends on various factors such as the material, insulation, and installation method.

  • The current carrying capacity of a cable is typically determined by the manufacturer and specified in the cable's datasheet.

  • Factors such as the material (aluminum in this case), insulation type, ambient temperature, and installation method all affect the current carrying capacity.

  • For a 185sqmm aluminum cable, the current carrying capacity ca...read more

Add your answer

Q6. What is the Height of db location on wall.

Ans.

The height of a dB location on a wall depends on the specific requirements of the project or application.

  • The height of a dB location on a wall is typically determined by the specific needs of the project or application.

  • Factors such as the type of equipment being installed, the purpose of the dB location, and the layout of the space will influence the height chosen.

  • For example, in a control room setting, dB locations may be placed at eye level for easy access and visibility.

  • In...read more

Add your answer

Q7. Why use the work permit system?

Ans.

The work permit system is used to ensure the safety of workers by controlling hazardous work activities.

  • To identify and assess potential hazards before starting work

  • To establish control measures to mitigate risks

  • To communicate and coordinate work activities among different teams

  • To ensure compliance with safety regulations and standards

  • To prevent accidents, injuries, and property damage

  • To provide a systematic approach for managing high-risk tasks

  • To promote a safety culture wit...read more

View 1 answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Coforge

based on 16 interviews
Interview experience
4.6
Excellent
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.7
 • 330 Interview Questions
3.3
 • 315 Interview Questions
3.7
 • 180 Interview Questions
4.1
 • 162 Interview Questions
3.9
 • 150 Interview Questions
3.8
 • 131 Interview Questions
View all
Top Vensa Infrastructure Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter