Filter interviews by
I applied via Referral and was interviewed in Nov 2021. There were 3 interview rounds.
4m change refers to a concept in production management where a change is made to improve efficiency, quality, or cost-effectiveness.
4m change involves making modifications to the Manpower, Machinery, Material, and Method used in production processes.
It aims to optimize resources, streamline operations, and enhance productivity.
For example, implementing automation in a manufacturing plant to reduce labor costs and incre...
Seeking new challenges and growth opportunities in a dynamic production environment.
Looking for a more challenging role
Seeking career advancement
Wanting to work in a more dynamic and innovative production environment
Desire to learn new skills and expand knowledge
Seeking better work-life balance
My notice period is 30 days.
My notice period is 30 days.
I am required to give a 30-day notice before leaving my current position.
I have already informed my current employer that I will be leaving in 30 days.
I am an experienced Production Executive with a strong background in managing production processes and teams.
Managed production operations and ensured timely delivery of products
Implemented cost-saving measures and improved production efficiency
Led cross-functional teams to achieve production targets
Developed and implemented quality control procedures
Streamlined production processes to optimize resource utilization
I am currently working as a Senior Production Manager in my current company.
My current designation is Senior Production Manager.
I am responsible for overseeing the production process and ensuring that production targets are met.
I manage a team of production supervisors and coordinate with other departments to ensure smooth operations.
I also analyze production data and implement strategies to improve efficiency and redu...
DWM stands for Daily Work Management. It refers to the process of planning, organizing, and executing daily tasks and activities to ensure efficient production operations.
DWM involves creating a daily work plan that outlines the tasks to be completed, their priorities, and the resources required.
It includes assigning responsibilities to team members, monitoring progress, and making adjustments as needed.
DWM aims to opt...
Spot welding and MIG welding are two common welding techniques used in production. Spot welding involves joining metal parts by applying heat and pressure at specific spots. MIG welding uses a consumable wire electrode to create an electric arc and join metal parts.
Spot welding is a resistance welding process where two metal surfaces are joined by applying heat and pressure at specific spots.
MIG welding, also known as ...
Welding defects are imperfections that occur during the welding process, compromising the quality and strength of the weld.
Welding defects can include cracks, porosity, incomplete fusion, and undercutting.
Cracks are fractures in the weld metal or heat-affected zone, caused by excessive stress or improper cooling.
Porosity refers to the presence of gas pockets within the weld, resulting from inadequate shielding gas or c...
Top trending discussions
Online Aptitude test
I was interviewed before Feb 2024.
To troubleshoot automation issues, start by identifying the root cause, reviewing logs, checking configurations, and testing in different environments.
Identify the specific issue or error message
Review automation logs for any errors or warnings
Check automation configurations for any mistakes or inconsistencies
Test the automation in different environments to isolate the issue
Collaborate with team members or stakeholders
Knowledge of scripting languages like Python or SQL is essential for a Senior Engineer role.
Proficiency in scripting languages like Python, Bash, PowerShell, etc. is important for automating tasks and processes.
Understanding of SQL for database querying and manipulation is crucial for data-driven applications.
Experience with writing and executing scripts to improve system efficiency and performance.
Ability to troublesh...
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Referral and was interviewed before Aug 2021. There were 2 interview rounds.
posted on 2 Jan 2022
I applied via Recruitment Consultant and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.
First angle projection and third angle projection are two methods of creating 2D drawings of 3D objects.
First angle projection is commonly used in Europe and Asia, while third angle projection is commonly used in North America.
In first angle projection, the object is placed in front of the viewing plane and the orthographic projections are drawn behind it.
In third angle projection, the object is placed behind the viewi...
Types of fits and tolerances are important in manufacturing to ensure proper functioning of parts.
Fits refer to the degree of tightness or looseness between two mating parts.
Clearance fit allows for free movement between parts, while interference fit requires force to assemble.
Transition fit is a combination of clearance and interference fit.
Tolerances refer to the allowable variation in dimensions of a part.
A tight to...
based on 2 reviews
Rating in categories
Quality Engineer
30
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Supervisor
22
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
14
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Prama Hikvision India
MCM Telecom Equipment
Alfanar
Sgs Tekniks Manufacturing