Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before May 2022. There were 4 interview rounds.
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
FESTO and SMC are the pneumatics supplies used by Samsung.
FESTO and SMC are reputable brands known for their high-quality pneumatic products.
Samsung likely uses FESTO and SMC supplies for their reliability and performance.
These brands offer a wide range of pneumatic components such as valves, cylinders, and fittings.
A pick and place unit is a robotic system used in manufacturing to pick up components or products and place them in a specific location.
Consists of a robotic arm with a gripper to pick up items
Used in assembly lines for automation
Can be programmed to pick and place items with precision
Commonly used in industries like electronics, automotive, and packaging
We use high-quality visualization software and cameras for detailed imaging.
We use industry-standard visualization software such as AutoCAD, SolidWorks, and MATLAB for design and analysis.
For cameras, we typically use high-resolution DSLR cameras like Canon EOS or Nikon D series for capturing detailed images.
In some cases, we also utilize specialized cameras like thermal imaging cameras for specific applications.
I appeared for an interview in Aug 2024.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma aims to achieve near-perfect quality by identifying and eliminating causes of defects or errors.
It uses statistical tools and techniques to measure and analyze process performance.
The goal of Six Sigma is to reduce variation and improve efficiency, ultimately leading to cost savings and customer satisfaction.
Compa...
Implemented a kaizen to streamline production process, reducing lead time by 20%.
Identified bottlenecks in the production process
Implemented visual management tools to track progress
Trained team members on new processes and best practices
Absenteeism and attrition can be controlled through various strategies such as improving work culture, offering competitive benefits, and providing opportunities for growth.
Improve work culture by promoting work-life balance and creating a positive work environment.
Offer competitive benefits such as health insurance, flexible work hours, and performance bonuses.
Provide opportunities for growth and development through t...
The OE Calculation Formula is used to determine the efficiency of a process or system.
OE (Overall Equipment) = (Operating Time - Downtime) / Operating Time
Operating Time is the total time the equipment is available for production.
Downtime is the total time the equipment is not available for production.
OE value ranges from 0 to 1, with 1 indicating perfect efficiency.
Example: OE = (500 hours - 50 hours) / 500 hours = 0.
I appeared for an interview in Dec 2024.
A three level inverter topology consists of three voltage levels to generate a sinusoidal output waveform.
Three level inverters use multiple power switches to create three voltage levels: positive, zero, and negative.
They are used in high power applications where a high quality output waveform is required.
Examples include solar inverters, motor drives, and grid-tied inverters.
Data centre electrical configuration with UPS involves backup power supply to ensure continuous operation.
Data centre electrical configuration includes primary power source from utility grid.
UPS (Uninterruptible Power Supply) provides backup power in case of utility power failure.
UPS systems can be standalone or integrated with generators for extended backup.
UPS systems are typically designed with redundancy for reliab...
based on 1 review
Rating in categories
Sales Officer
30
salaries
| ₹1.9 L/yr - ₹4 L/yr |
Area Sales Manager
22
salaries
| ₹5.6 L/yr - ₹10.5 L/yr |
Sales Executive
13
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Quality Engineer
11
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Marketing Executive
9
salaries
| ₹2.5 L/yr - ₹4.3 L/yr |
TE Connectivity
Vertiv
Navitasys India
Flash Electronics