Upload Button Icon Add office photos

Filter interviews by

Universal Construction Machinery And Equipment Maintenance Manager Interview Questions and Answers

Updated 3 Jun 2022

Universal Construction Machinery And Equipment Maintenance Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Any technical and admin question

Interview Preparation Tips

Interview preparation tips for other job seekers - do job any type as related to your education

Interview questions from similar companies

Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There were 4 interview rounds.

Round 1 - Maintenance 

(2 Questions)

  • Q1. Machines information
  • Q2. All machines and all problems.. solve the maintenance manager
Round 2 - HR 

(4 Questions)

  • Q1. Tell me about yourself
  • Q2. Where have you worked before this
  • Q3. What information do you have?
  • Q4. What work did you do in the other company before this?
Round 3 - Group Discussion 

Information about the project

Round 4 - Technical 

(2 Questions)

  • Q1. Information about machines
  • Q2. Axis of the machine

Interview Preparation Tips

Topics to prepare for Action Construction Equipment Maintenance Engineer interview:
  • Hydraulics
  • Pneumatic System
  • Robotics
  • Workshop
Interview preparation tips for other job seekers - Laser marking machine operator DET
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Referral

Round 1 - Technical 

(3 Questions)

  • Q1. DIFTER MAINTEANCE
  • Q2. SMART ROCK T40 OPERATION
  • Q3. MANPOWER HANDLING

Interview Preparation Tips

Interview preparation tips for other job seekers - WORKING IN EPIROC IS AMATTER OF PROUD FOR ME BECAUSE. I HAVE BEEN WORKING IN EPIROC THIRD PARTY SINCE 04 YEARS.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How to calculate Boiler direct & indirect efficiency ?
  • Ans. 

    Boiler efficiency can be calculated by measuring the heat input and heat output of the boiler.

    • Calculate the heat input by measuring the fuel flow rate, fuel calorific value, and fuel consumption.

    • Calculate the heat output by measuring the steam flow rate and steam enthalpy.

    • Direct efficiency = (Heat output / Heat input) * 100%

    • Indirect efficiency = Direct efficiency * Boiler efficiency of other components (like economizer

  • Answered by AI
  • Q2. What is the monthly maintenance cost of your section ?
  • Ans. 

    The monthly maintenance cost of my section is approximately $10,000.

    • The monthly maintenance cost includes expenses for spare parts, labor, equipment rental, and utilities.

    • Regular maintenance tasks such as lubrication, inspections, and repairs contribute to the overall cost.

    • Cost may vary depending on the size of the section, age of equipment, and frequency of maintenance activities.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Technical and maintenance related
  • Q2. Machine maintenance
  • Q3. Machine service related
  • Q4. Personal information related
  • Q5. Software skills and programming
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. How induction motor started
  • Ans. 

    An induction motor starts when a rotating magnetic field is created by the stator winding, inducing current in the rotor.

    • Induction motors start by using the principle of electromagnetic induction.

    • The stator winding is energized with a three-phase AC current, creating a rotating magnetic field.

    • This rotating magnetic field induces a current in the rotor, which in turn creates a magnetic field.

    • The interaction between the ...

  • Answered by AI
  • Q2. What's is your father name
  • Q3. Transformer working, also induction Furnace working &basic principle
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Sep 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Tell about ur current company and salary
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical round with concerned HOD
Round 4 - Aptitude Test 

Simple aptitude and reasoning test

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Air compressor colling tawar boiler
  • Q2. Pump gasket set

Interview Preparation Tips

Topics to prepare for Thermax Limited Maintenance Fitter interview:
  • 6year
Interview preparation tips for other job seekers - Hard work

I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Technical details and documentation in maintenance Met HR for further process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sound in technical and department related documentation works

I applied via Naukri.com

Interview Questionnaire 

1 Question

  • Q1. Plz give questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Thisi interview was a technical one but was
Major a stress test

Universal Construction Machinery And Equipment Interview FAQs

How many rounds are there in Universal Construction Machinery And Equipment Maintenance Manager interview?
Universal Construction Machinery And Equipment interview process usually has 1 rounds. The most common rounds in the Universal Construction Machinery And Equipment interview process are Technical.

Tell us how to improve this page.

People are getting interviews through

based on 1 Universal Construction Machinery And Equipment interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.2
 • 235 Interviews
Atlas Copco Interview Questions
4.2
 • 77 Interviews
Timken Interview Questions
4.0
 • 45 Interviews
View all
Service Engineer
7 salaries
unlock blur

₹1.3 L/yr - ₹2.4 L/yr

Civil Site Engineer
6 salaries
unlock blur

₹1.6 L/yr - ₹4 L/yr

Junior Engineer
5 salaries
unlock blur

₹1.8 L/yr - ₹2.4 L/yr

Executive Service Engineer
4 salaries
unlock blur

₹1.5 L/yr - ₹2 L/yr

Accounts Manager
4 salaries
unlock blur

₹3.4 L/yr - ₹7 L/yr

Explore more salaries
Compare Universal Construction Machinery And Equipment with

Thermax Limited

4.2
Compare

Tractors and Farm Equipment

4.1
Compare

Isgec Heavy Engineering

3.8
Compare

Kirloskar Oil Engines

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview