Upload Button Icon Add office photos

UltraTech Cement

Compare button icon Compare button icon Compare
4.2

based on 6.7k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

UltraTech Cement CCR Operator Interview Questions and Answers

Updated 25 Feb 2023

UltraTech Cement CCR Operator Interview Experiences

1 interview found

CCR Operator Interview Questions & Answers

user image Anonymous

posted on 2 Jun 2022

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Where you work doing now?
  • Q2. What's your present CTC?
Round 3 - Technical 

(2 Questions)

  • Q1. How many parameters mantain?
  • Ans. 

    As a CCR Operator, I maintain multiple parameters depending on the plant and equipment.

    • The number of parameters varies depending on the plant and equipment being operated.

    • Some common parameters include temperature, pressure, flow rate, and chemical levels.

    • It is important to monitor and adjust these parameters to ensure safe and efficient operation.

    • Regular maintenance and calibration of equipment is necessary to ensure ...

  • Answered by AI
  • Q2. Quality related questions?

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is the major part of the job which reveals the speech qualities etc. of the person.

Skills evaluated in this interview

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is WHRB system.
  • Ans. 

    WHRB system stands for Waste Heat Recovery Boiler system, which is used to recover waste heat from various processes and convert it into useful energy.

    • WHRB system is used to recover waste heat from processes like exhaust gases, hot air, or hot liquids.

    • The recovered heat is used to generate steam or hot water for various applications.

    • It helps in reducing energy consumption and increasing overall efficiency of the system...

  • Answered by AI
  • Q2. West heat (recovery) use from boiler to steam generate and use to TG for power generation
  • Ans. 

    West heat recovery from boiler is used to generate steam which is then used in a turbine generator for power generation.

    • Heat recovery from boiler is utilized to generate steam for power generation

    • The steam produced is then used in a turbine generator to generate electricity

    • This process helps in maximizing energy efficiency and reducing waste

    • Example: Waste heat from the boiler is captured and used to heat water, creatin

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

About Vartical row mill

Interview Preparation Tips

Interview preparation tips for other job seekers - Always work is first priority

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Ask me about of my working experience knowledge

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement CCR Operator interview:
  • Kiln operation
  • Production Planning
  • From my Resume
Interview preparation tips for other job seekers - Ask for one interview chance then show your champ
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Simple question tank farm
  • Q2. Basic knowledge of tank farm

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't join Dangote as I am working in Dangote here no good food no medical no travel ticket no timely salary no visa timely renewal nothing good here better try gulf countries
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I was interviewed in Dec 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Pump heat exchanger

Interview Preparation Tips

Topics to prepare for Grasim Industries Production Operator interview:
  • Pumps
  • Heat Exchangers

Plant Operator Interview Questions & Answers

ACC user image Nishant Sharma

posted on 30 Sep 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

In first round they take online test by sharing link minimum passing score you have to gain 60% for selection. Question will mixed with Technical And Non Technical.

Round 3 - Technical 

(3 Questions)

  • Q1. In Second Round Face to Face Interview They Will Ask to Some Basics Questions Related To Your Field. As I Am From Electrical Field.
  • Q2. 1) Difference Between Star And Delta 2) Tell me About Control Wiring and Power Wiring 3) We Are Safe Till How Much Getting Current or Voltage
  • Ans. 

    Star and Delta are two different types of connections used in electrical systems. Control wiring is used for controlling devices, while power wiring is used for supplying power. The safe current or voltage limit depends on the specific equipment and safety regulations.

    • Star connection is used for connecting three-phase electrical loads, while Delta connection is used for connecting single-phase loads.

    • Control wiring is u...

  • Answered by AI
  • Q3. Tell me About Step down and Step Up Transformer Work
  • Ans. 

    Step down transformers decrease voltage while step up transformers increase voltage.

    • Step down transformers have more turns in the primary coil than in the secondary coil, resulting in a lower output voltage.

    • Step up transformers have more turns in the secondary coil than in the primary coil, resulting in a higher output voltage.

    • Step down transformers are commonly used in household appliances to reduce voltage from the m...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work As Per Pay Scale Not More Than That Otherwise They Will Using All The Time Your Abilities But Not Pay You That Much As Per Your Talent.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is WHRB system.
  • Ans. 

    WHRB system stands for Waste Heat Recovery Boiler system, which is used to recover waste heat from various processes and convert it into useful energy.

    • WHRB system is used to recover waste heat from processes like exhaust gases, hot air, or hot liquids.

    • The recovered heat is used to generate steam or hot water for various applications.

    • It helps in reducing energy consumption and increasing overall efficiency of the system...

  • Answered by AI
  • Q2. West heat (recovery) use from boiler to steam generate and use to TG for power generation
  • Ans. 

    West heat recovery from boiler is used to generate steam which is then used in a turbine generator for power generation.

    • Heat recovery from boiler is utilized to generate steam for power generation

    • The steam produced is then used in a turbine generator to generate electricity

    • This process helps in maximizing energy efficiency and reducing waste

    • Example: Waste heat from the boiler is captured and used to heat water, creatin

  • Answered by AI

I was interviewed in Aug 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Clinker ,Gypsum,flyash =65+30+5=100% cement

Interview Preparation Tips

Interview preparation tips for other job seekers - 2 year Experience in cement plant(ccr operation)

I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Ask me about of my working experience knowledge

Interview Preparation Tips

Topics to prepare for Dalmia Bharat Cement CCR Operator interview:
  • Kiln operation
  • Production Planning
  • From my Resume
Interview preparation tips for other job seekers - Ask for one interview chance then show your champ

UltraTech Cement Interview FAQs

How many rounds are there in UltraTech Cement CCR Operator interview?
UltraTech Cement interview process usually has 3 rounds. The most common rounds in the UltraTech Cement interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in UltraTech Cement CCR Operator interview?

Some of the top questions asked at the UltraTech Cement CCR Operator interview -

  1. How many parameters manta...read more
  2. Quality related questio...read more

Tell us how to improve this page.

UltraTech Cement CCR Operator Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

JK Cement Interview Questions
4.1
 • 242 Interviews
Grasim Industries Interview Questions
4.0
 • 201 Interviews
ACC Interview Questions
3.9
 • 184 Interviews
Shree Cement Interview Questions
3.8
 • 149 Interviews
Ambuja Cements Interview Questions
3.9
 • 105 Interviews
Star Cement Interview Questions
4.0
 • 63 Interviews
HIL Limited Interview Questions
4.1
 • 61 Interviews
View all
UltraTech Cement CCR Operator Salary
based on 27 salaries
₹1.4 L/yr - ₹7.3 L/yr
11% less than the average CCR Operator Salary in India
View more details

UltraTech Cement CCR Operator Reviews and Ratings

based on 12 reviews

3.6/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.6

Salary

3.5

Job security

3.4

Company culture

3.4

Promotions

3.4

Work satisfaction

Explore 12 Reviews and Ratings
Assistant Manager
891 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Senior Engineer
801 salaries
unlock blur

₹4.3 L/yr - ₹14 L/yr

Engineer
447 salaries
unlock blur

₹3.5 L/yr - ₹11 L/yr

Assistant Engineer
391 salaries
unlock blur

₹2.5 L/yr - ₹9 L/yr

Officer
384 salaries
unlock blur

₹3.6 L/yr - ₹11.5 L/yr

Explore more salaries
Compare UltraTech Cement with

Ambuja Cements

3.9
Compare

ACC

3.9
Compare

Shree Cement

3.8
Compare

Dalmia Bharat Cement

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview