i
Tmte Metal Tech
Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before May 2023. There were 2 interview rounds.
Improving workers efficiency can be achieved through proper training, clear communication, setting realistic goals, providing necessary resources, and recognizing and rewarding good performance.
Provide proper training to ensure workers have the necessary skills and knowledge to perform their tasks efficiently
Communicate clearly with workers to avoid misunderstandings and ensure everyone is on the same page
Set realistic...
Top trending discussions
I was interviewed in Jul 2017.
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 12 Aug 2021
I applied via Company Website and was interviewed before Aug 2020. There were 4 interview rounds.
Major problems in any production plant include equipment breakdowns, supply chain disruptions, quality control issues, and workforce management challenges.
Equipment breakdowns: Regular maintenance and proactive monitoring can help prevent breakdowns. Having backup equipment or spare parts can minimize downtime.
Supply chain disruptions: Building strong relationships with suppliers, having alternative suppliers, and impl...
Assess the reasons for not achieving the target and create a plan to catch up.
Analyze the production process to identify bottlenecks or inefficiencies
Determine if there were any unexpected issues or delays that impacted production
Develop a plan to increase productivity and catch up on missed targets
Communicate the plan to relevant stakeholders and ensure everyone is on board
Monitor progress closely and make adjustments
The most important aspect is quality as it ensures customer satisfaction and brand reputation. The least important is maintenance as it can be outsourced or automated.
Quality is crucial as it directly impacts customer satisfaction and brand reputation.
Maintaining high quality standards ensures repeat business and positive word-of-mouth.
Quality control measures should be implemented throughout the production process.
Mai...
Inefficiency
Lack of streamlined processes
Poor communication between departments
Inadequate training of employees
Obsolete technology or equipment
High levels of waste or defects
Low productivity or output
Long lead times or delays
High costs or expenses
Low morale or motivation among employees
I was interviewed in Mar 2021.
I was interviewed in May 2019.
Steel sections are structural shapes made from steel for construction purposes.
I-beams
H-beams
C-channels
Angle sections
T-sections
Z-sections
Box sections
Circular sections
Different types of loads applied on long and short steel columns
Long columns are more susceptible to buckling under compressive loads
Short columns are more susceptible to crushing under compressive loads
Long columns are more likely to experience bending under lateral loads
Short columns are more likely to experience shear under lateral loads
Examples of loads include dead load, live load, wind load, seismic load, etc.
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
based on 2 interviews
Interview experience
Design Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
14
salaries
| ₹0 L/yr - ₹0 L/yr |
PPC Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Assurance Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Steel
JSW Steel
Hindalco Industries
Vedanta Limited