Upload Button Icon Add office photos

Filter interviews by

TK Elevator Installation Engineer Interview Questions and Answers

Updated 30 Jan 2025

TK Elevator Installation Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How to drop Plumb for shaft musurement
  • Ans. 

    To drop plumb for shaft measurement, ensure the plumb bob is hanging freely and perpendicular to the ground.

    • Ensure the plumb bob is hanging freely without any obstructions

    • Make sure the plumb bob is hanging perpendicular to the ground

    • Use a level to confirm the plumb bob is straight

    • Measure the distance from the plumb bob to the shaft to determine alignment

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Why you are move the job
  • Ans. 

    I am seeking new challenges and opportunities for growth in my career.

    • Seeking new challenges and opportunities for growth

    • Interested in expanding my skill set

    • Looking for a more dynamic work environment

  • Answered by AI

I applied via Referral and was interviewed before May 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. At what position you see yourself in upcoming years

Interview Preparation Tips

Topics to prepare for TK Elevator Installation Engineer interview:
  • Basic electrical and mechanical
Interview preparation tips for other job seekers - Never share for 5 or 10 years expectations. Always show impact with couple of years expectations and what will be your first agenda

Installation Engineer Interview Questions Asked at Other Companies

Q1. How many digree angle cut fibre
Q2. What is the colour code of 24 core fiber
Q3. What is fiber optic & FTTH known
asked in Team Lease
Q4. What is Cable fault identify tool name?
Q5. How to plan project installation schedule?

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Core Java, J2EE

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Depends on experience
  • Q2. Related to systematic approach
  • Ans. Problem solving tools, OEE, FPY, Root cause analysis. 14Q, 5S
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Never join Bosch chakan if want to have growing future In career and work life balance.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Protocol relatedsuch as
  • Q2. Can protocol framing
  • Q3. Uds services and nrc code
  • Q4. Python with automation
  • Q5. Dspace, vt, aspice, xcp with automation

Interview Preparation Tips

Topics to prepare for Schaeffler India Senior Engineer interview:
  • Canoe
  • CAN protocol
  • UDS
  • Python
  • CAPL
  • Hil testing
  • DSpace
  • Software integration
  • Bug Tracking
  • Regression Testing
  • vt
  • Vt studio
  • Aspice
  • Fusa
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Explain function pointers in c?
  • Ans. 

    Function pointers in C are pointers that point to functions instead of data.

    • Function pointers are used to pass functions as arguments to other functions.

    • They can be used to implement callbacks and event handlers.

    • Syntax: return_type (*ptr_name)(parameters);

    • Example: int (*funcPtr)(int, int);

  • Answered by AI
  • Q2. Explain DCM module from BSW?
  • Ans. 

    DCM module in BSW is responsible for managing diagnostic communication between the vehicle and external diagnostic tools.

    • DCM stands for Diagnostic Communication Manager

    • It handles communication protocols such as UDS, KWP2000, and OBD

    • DCM manages diagnostic sessions, communication parameters, and diagnostic trouble codes

    • It provides APIs for diagnostic services like reading and clearing DTCs

    • Example: DCM module in BSW facil...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Project Management methods

Round 2 - One-on-one 

(1 Question)

  • Q1. Introduction about your pervious project
Round 3 - Technical 

(1 Question)

  • Q1. Project Management processes
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Could you provide details about your work profile and the projects you have completed in your previous company?
  • Ans. 

    Experienced Senior Engineer with a focus on software development and project management in diverse industries.

    • Led a team of 5 engineers in developing a cloud-based inventory management system, improving efficiency by 30%.

    • Implemented Agile methodologies, resulting in a 25% reduction in project delivery time.

    • Designed and deployed a microservices architecture for a healthcare application, enhancing scalability and maintai...

  • Answered by AI
  • Q2. S-n curve, natural frequency and basic abaqus and nastran tool question
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. NX tool test given
  • Q2. Technical round with interviewers
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Case based question

TK Elevator Interview FAQs

How many rounds are there in TK Elevator Installation Engineer interview?
TK Elevator interview process usually has 1-2 rounds. The most common rounds in the TK Elevator interview process are One-on-one Round and HR.

Tell us how to improve this page.

TK Elevator Installation Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Bosch Interview Questions
4.2
 • 334 Interviews
VVDN Technologies Interview Questions
3.6
 • 199 Interviews
Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
SGS Interview Questions
3.9
 • 97 Interviews
TE Connectivity Interview Questions
4.1
 • 84 Interviews
Hilti Interview Questions
3.5
 • 61 Interviews
View all

TK Elevator Installation Engineer Reviews and Ratings

based on 5 reviews

2.9/5

Rating in categories

3.8

Skill development

2.8

Work-life balance

4.1

Salary

4.5

Job security

4.7

Company culture

4.5

Promotions

4.6

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
161 salaries
unlock blur

₹6 L/yr - ₹20 L/yr

Senior Executive
132 salaries
unlock blur

₹4.1 L/yr - ₹16 L/yr

Customer Service Engineer
117 salaries
unlock blur

₹1.9 L/yr - ₹8.5 L/yr

Senior Engineer
75 salaries
unlock blur

₹4 L/yr - ₹12.5 L/yr

Engineer
71 salaries
unlock blur

₹2.1 L/yr - ₹7.7 L/yr

Explore more salaries
Compare TK Elevator with

Bosch

4.2
Compare

VVDN Technologies

3.6
Compare

SGS

3.9
Compare

Caterpillar Inc

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview