What should be the height of Tremie pipe from pile founding level during concrete?
AnswerBot
6mo
The height of Tremie pipe from pile founding level during concrete should be maintained at a certain level to ensure proper placement of concrete.
The Tremie pipe should typically be kept at a height o...read more
Mukesh Kumar Thakur
2mo
1.5 m
thangamuniyasamy
1y
Minimum 1m.