Filter interviews by
I applied via Naukri.com and was interviewed before Mar 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
Cos and Qos are networking terms. Cos stands for Class of Service and Qos stands for Quality of Service.
Cos is used to prioritize traffic in a network based on the importance of the data.
Qos is used to manage and control network resources to ensure that important data is given priority over less important data.
Cos and Qos are often used together to ensure that critical data is given the highest priority.
Examples of app...
Trending analysis is the process of identifying patterns and changes in data over time.
It involves analyzing data over a period of time to identify trends and patterns.
It helps in predicting future outcomes based on past trends.
It is used in various fields such as finance, marketing, and healthcare.
For example, trending analysis can be used to identify the increase in sales of a particular product over a period of time...
Capacity can be calculated by analyzing the traffic flow and bandwidth utilization of the remaining site.
Analyze traffic flow and bandwidth utilization of the remaining site
Determine the maximum capacity of the remaining site
Consider the impact of the failed site on overall network capacity
In my current organization, my day-to-day work as a Capacity Analyst involves analyzing and forecasting resource capacity to ensure optimal utilization.
Analyze historical data and trends to identify patterns and make accurate capacity predictions
Collaborate with stakeholders to gather requirements and understand capacity needs
Monitor and track resource utilization and performance metrics
Generate reports and present fin...
Jitter is the variation in delay of received packets, while RTD is the time taken for a packet to travel from source to destination.
Jitter is measured in milliseconds and can cause packet loss and poor network performance.
RTD is affected by factors such as distance, network congestion, and routing.
Jitter can be reduced by using Quality of Service (QoS) techniques such as traffic shaping and buffering.
RTD can be measure...
Latency is the time taken for a signal to travel from one point to another, while delay is the time taken for a signal to be processed.
Latency is the time taken for a signal to travel from one point to another, usually measured in milliseconds.
Delay is the time taken for a signal to be processed, which can be affected by factors such as network congestion or processing time.
Latency can be reduced by improving network i...
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
I am a detail-oriented business analyst with a strong background in data analysis and problem-solving.
Experienced in gathering and analyzing business requirements
Skilled in creating detailed reports and presentations
Proficient in using data visualization tools like Tableau
Strong communication and interpersonal skills
Certified in Agile methodologies
I appeared for an interview in Sep 2024, where I was asked the following questions.
As a Business Analyst, I bridge the gap between stakeholders and IT, ensuring project requirements are met effectively.
Gather and analyze business requirements from stakeholders, e.g., conducting interviews and workshops.
Create detailed documentation, such as business requirement documents (BRDs) and functional specifications.
Facilitate communication between technical teams and business units to ensure alignment on pro...
Effective stakeholder management involves communication, understanding needs, and building relationships for project success.
Identify stakeholders: Map out all stakeholders involved in the project, such as clients, team members, and executives.
Understand their needs: Conduct interviews or surveys to gather insights on their expectations and concerns.
Regular communication: Schedule regular updates through meetings or re...
Effective requirement gathering involves various techniques to ensure comprehensive understanding of stakeholder needs.
Interviews: Conduct one-on-one sessions with stakeholders to gather detailed insights. For example, interviewing doctors to understand patient management systems.
Surveys and Questionnaires: Distribute structured forms to collect quantitative data from a larger audience. For instance, using surveys to a...
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
I applied via Campus Placement and was interviewed before Jun 2021. There were 2 interview rounds.
Be prepared
I appeared for an interview in Aug 2017.
I applied via Company Website and was interviewed in Apr 2023. There were 3 interview rounds.
I have 3 years of work experience in discrete manufacturing.
I have worked in a production line environment where products are manufactured in batches.
I have experience in setting up and operating machinery such as CNC machines and assembly lines.
I have knowledge of quality control processes and have worked with various measuring tools.
I have also worked on process improvement projects to increase efficiency and reduce ...
It was easy . I was able to crack on time
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Software Engineer
174
salaries
| ₹9.6 L/yr - ₹27.2 L/yr |
Senior Software Engineer
122
salaries
| ₹19 L/yr - ₹49.5 L/yr |
Associate Software Engineer
53
salaries
| ₹7 L/yr - ₹10.1 L/yr |
Software Developer
48
salaries
| ₹7.9 L/yr - ₹22.5 L/yr |
Scrum Master
48
salaries
| ₹14.6 L/yr - ₹50.8 L/yr |
Jio
Vodafone Idea
Ericsson
Nokia