Filter interviews by
I appeared for an interview before Jan 2024.
As a Production Engineer, my roles and responsibilities include overseeing manufacturing processes, ensuring quality control, optimizing production efficiency, and troubleshooting any issues that arise.
Overseeing manufacturing processes to ensure they are running smoothly and efficiently
Implementing quality control measures to maintain high standards of production
Optimizing production efficiency through process improve...
There are 6 types of losses in production engineering.
1. Material losses - waste of raw materials during production.
2. Time losses - inefficiencies in production processes leading to delays.
3. Energy losses - inefficient use of energy sources.
4. Quality losses - defects in the final product.
5. Maintenance losses - downtime due to equipment breakdowns.
6. Opportunity losses - missed opportunities for improvement or cost
I expect the company to provide opportunities for growth, a supportive work environment, and competitive compensation.
Opportunities for career growth and advancement
Supportive work environment with a strong team culture
Competitive compensation and benefits package
Clear communication and feedback from management
Opportunities for training and development
Work-life balance
I am seeking new challenges and opportunities for growth in my career.
Seeking new challenges and opportunities for growth
Looking for a more dynamic work environment
Want to expand my skill set and knowledge
Desire for career advancement
Personal reasons such as relocation or family commitments
Top trending discussions
posted on 24 Apr 2022
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction.
They consist of two or more coils of wire, known as windings, which are wound around a common magnetic core.
The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.
W...
Each department has its own specific procedures to ensure efficient production.
The production department is responsible for creating and assembling the final product.
The quality control department ensures that the product meets the required standards.
The maintenance department is responsible for keeping the machinery and equipment in good working condition.
The logistics department handles the transportation and deliver...
posted on 2 Jul 2021
I applied via Naukri.com and was interviewed before Dec 2023. There were 5 interview rounds.
Agriculture starters are products or materials used to initiate plant growth and development.
Agriculture starters can include seeds, seedlings, fertilizers, and growth hormones.
They are essential for establishing healthy crops and maximizing yield.
Examples of agriculture starters include potting soil, compost, and plant nutrients.
posted on 18 Oct 2024
I applied via Naukri.com and was interviewed before Oct 2023. There were 2 interview rounds.
Type of personality test
Led a team to successfully implement a new software system, resulting in a 20% increase in efficiency.
Led team in implementing new software system
Achieved 20% increase in efficiency
Received recognition for successful project completion
To solve any problem, break it down into smaller parts, analyze the root cause, brainstorm solutions, and implement the best one.
Break down the problem into smaller, manageable parts
Identify the root cause of the problem
Brainstorm potential solutions
Evaluate and choose the best solution
Implement the chosen solution and monitor its effectiveness
posted on 6 Aug 2022
I appeared for an interview in Jul 2022.
60 percent core and 40 percent aptitude
Tests done on a transformer include insulation resistance test, turns ratio test, winding resistance test, and load test.
Insulation resistance test checks the insulation resistance between windings and between windings and ground.
Turns ratio test measures the ratio of the number of turns in the primary winding to the number of turns in the secondary winding.
Winding resistance test measures the resistance of each windin...
CT and PT are used in electrical systems for measurement and protection purposes.
CT (Current Transformer) is used to measure high currents and step them down to a manageable level for measurement and protection devices.
PT (Potential Transformer) is used to measure high voltages and step them down to a safe level for measurement and protection devices.
CTs and PTs provide isolation and safety by separating the high volta...
The generation voltage in India varies depending on the location and power plant.
The voltage ranges from 110V to 440V depending on the location.
The power plants generate electricity at different voltages.
The national grid operates at a voltage of 400kV and 765kV.
India has a mix of AC and DC power transmission systems.
High voltage is used for transmission to reduce power loss and increase efficiency.
High voltage reduces the current required for a given amount of power, which reduces power loss due to resistance in the transmission lines.
Lower current also means smaller conductors can be used, reducing material and installation costs.
High voltage transmission is more efficient over long distances, reducing the need for additional pow...
Renewable energy power plants are generally cheaper to install than traditional fossil fuel power plants.
Renewable energy power plants such as solar, wind, and hydroelectric are cheaper to install than traditional fossil fuel power plants.
The cost of installation for renewable energy power plants has decreased significantly in recent years due to advancements in technology and increased demand.
Fossil fuel power plants ...
OC test is done on LV side to avoid high voltage on secondary side. SC test is done on HV side to avoid high current on primary side.
LV side has lower voltage rating, hence safer for OC test
HV side has higher current rating, hence suitable for SC test
OC test checks insulation resistance and winding resistance
SC test checks impedance and voltage regulation
Example: A 100 MVA transformer with 220 kV HV and 33 kV LV rating
posted on 27 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I worked on a project to develop a mobile application for a local restaurant.
The project involved designing the user interface and user experience of the app.
I collaborated with a team of developers to build the app using React Native.
We integrated features such as online ordering, menu browsing, and push notifications.
I also conducted user testing and made improvements based on feedback.
The project was completed withi
Job performances are evaluated based on the quality and quantity of work done, adherence to deadlines, teamwork, and communication skills.
Quality and quantity of work done
Adherence to deadlines
Teamwork
Communication skills
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Diploma Trainee Engineer
318
salaries
| ₹2.9 L/yr - ₹4 L/yr |
Assistant Engineer
166
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Engineer
89
salaries
| ₹4 L/yr - ₹8 L/yr |
Assistant Manager
68
salaries
| ₹7.9 L/yr - ₹15.7 L/yr |
Senior Engineer
62
salaries
| ₹6.7 L/yr - ₹11.5 L/yr |
Okaya Power
GM Modular
Mettler-Toledo
Elecon Engineering