I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.
Head Machine Shop, Leader machining operations
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Validation process ensures that a product meets the requirements and specifications set by the customer.
Validation process involves testing and analyzing a product to ensure it meets the desired specifications.
It is a crucial step in the manufacturing process to ensure quality and compliance.
Validation can include various tests such as performance testing, durability testing, and reliability testing.
Validation process ...
My role in the PD cycle involves designing, testing, and optimizing manufacturing processes to improve efficiency and quality.
Designing new manufacturing processes
Testing and evaluating the effectiveness of these processes
Optimizing existing processes to improve efficiency and quality
Collaborating with cross-functional teams to implement changes
Analyzing data to identify areas for improvement
posted on 29 Nov 2023
I applied via Naukri.com and was interviewed in May 2023. There were 2 interview rounds.
I have the necessary skills, experience, and passion to excel in this role.
I have a strong background in manufacturing engineering with a proven track record of success.
I am highly skilled in process optimization, cost reduction, and quality improvement.
I have experience in implementing lean manufacturing principles and driving continuous improvement initiatives.
I am a team player and have excellent communication and p...
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
I applied via Times Job and was interviewed before Dec 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand. Cycle time is the time it takes to complete one cycle of a process.
Takt time is calculated by dividing the available production time by the customer demand.
Cycle time is the time it takes to complete one unit of a product.
Cycle time can be used to identify bottlenecks in the production process.
Reducing cycle time can increase productivit...
Line balancing is the process of optimizing workloads across an assembly line to improve efficiency and productivity.
Identify the tasks required to complete the assembly process
Determine the cycle time for each task
Calculate the total available work time
Allocate tasks to workstations based on cycle time and available work time
Adjust the allocation to minimize idle time and maximize efficiency
I applied via Naukri.com and was interviewed in May 2019. There were 5 interview rounds.
Quality Engineer
27
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Oprating Engineer
17
salaries
| ₹2.6 L/yr - ₹4.3 L/yr |
Senior Engineer
15
salaries
| ₹4.3 L/yr - ₹7 L/yr |
Assistant Manager
11
salaries
| ₹6 L/yr - ₹10.6 L/yr |
Senior Production Engineer
9
salaries
| ₹4.1 L/yr - ₹6 L/yr |
Syngenta
Bayer Crop Science Vegetable Seeds
Bayer
DuPont