Filter interviews by
Clear (1)
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2022. There were 2 interview rounds.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 9 Sep 2021
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
The assembly line sequence involves a step-by-step process of assembling parts to create a final product.
The process starts with the arrival of raw materials
Parts are then assembled in a specific order
Quality checks are performed at various stages
The final product is packaged and shipped
Efficiency and safety are key considerations throughout the process
I applied via Walk-in and was interviewed before Oct 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Service Engineer
140
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
122
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
106
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
103
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Divisional Manager
82
salaries
| ₹0 L/yr - ₹0 L/yr |
Komatsu
Caterpillar Inc
Volvo Construction Equipment
BEML