I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.
Transformer works on the principle of electromagnetic induction to transfer electrical energy between two or more circuits.
Transformers have two coils of wire, known as primary and secondary coils.
When an alternating current flows through the primary coil, it creates a changing magnetic field.
This changing magnetic field induces a voltage in the secondary coil, transferring electrical energy.
Transformers are used to st...
Top trending discussions
I applied via Company Website and was interviewed in Jul 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.
I applied via Referral and was interviewed in Jan 2024. There were 2 interview rounds.
Maintenance planning involves creating a systematic approach to ensure efficient and effective maintenance activities.
Developing a maintenance schedule based on equipment requirements and priorities
Identifying and procuring necessary resources, such as spare parts and tools
Coordinating with other departments to minimize disruptions and downtime
Implementing preventive maintenance strategies to reduce breakdowns
Tracking ...
Addressing employee behavior issues as a Maintenance Manager
Identify the specific behavior that is not good
Have a private conversation with the employee to discuss the issue
Clearly communicate expectations and provide feedback on how the behavior is impacting the team or organization
Offer support and resources to help the employee improve
Implement disciplinary actions if necessary, following company policies and proced...
posted on 21 Dec 2023
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
posted on 22 May 2024
Types of valves include gate valves, globe valves, ball valves, butterfly valves, and check valves.
Gate valves
Globe valves
Ball valves
Butterfly valves
Check valves
posted on 27 Jun 2022
De-ashing process from ESP to silo involves several steps.
The ash is collected in hoppers located at the bottom of the ESP.
The ash is then transported to the silo using a pneumatic conveying system.
The ash is stored in the silo until it can be disposed of properly.
Regular maintenance of the ESP and pneumatic conveying system is necessary to ensure efficient de-ashing.
Proper safety measures must be taken during the de-a
The capacity of ESP hoppers varies depending on the size and model of the equipment.
ESP hoppers can range from a few hundred cubic feet to several thousand cubic feet in capacity.
The capacity can also depend on the type of material being collected in the hopper.
It is important to regularly monitor and maintain the hopper to prevent overfilling and potential equipment damage.
I applied via Company Website and was interviewed in May 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Operation & Maintenance Engineer
7
salaries
| ₹2.2 L/yr - ₹2.4 L/yr |
Project Engineer
4
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Maintenance Engineer
4
salaries
| ₹3 L/yr - ₹3 L/yr |
Manager
3
salaries
| ₹3.9 L/yr - ₹5.2 L/yr |
Project Manager
3
salaries
| ₹7.5 L/yr - ₹9 L/yr |
Jakson Group
ReNew
Vestas
Wind World