I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
A theodolite is a precision instrument used for measuring angles in the horizontal and vertical planes.
Used in surveying and construction to measure angles and distances
Consists of a telescope mounted on a rotating base with graduated circles for angle measurement
Commonly used in setting out building foundations, roads, and tunnels
Helps in determining elevations, heights, and distances between objects
The ratio of M20 grade concrete is 1:1.5:3 (cement:sand:aggregate).
The ratio of M20 grade concrete is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate.
This ratio is commonly used for construction of residential buildings, bridges, and pavements.
It is important to follow the correct mix ratio to ensure the strength and durability of the concrete.
A purline is a horizontal structural member in a roof construction that supports the common rafters.
Purlines are typically made of wood, steel, or aluminum.
They are placed parallel to the ridge of the roof and provide support for the roof covering material.
Purlines help distribute the weight of the roof evenly and prevent sagging or structural issues.
Examples of roof types that use purlines include gable roofs, hip roo
A module is a self-contained unit that can be used in various systems or projects.
Modules are often used in solar energy systems to generate electricity.
They typically consist of multiple solar cells connected together.
Modules can vary in size and power output depending on the specific application.
Examples of modules include monocrystalline, polycrystalline, and thin-film solar panels.
Top trending discussions
I applied via Naukri.com and was interviewed before Feb 2022. There were 3 interview rounds.
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Job Portal and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
About experience about cell and SOP,MSDS, etc.
About experience about and how to improve quality, efficiency,
TPS stands for Transactions Per Second, a metric used to measure the number of transactions processed in a system within a second.
TPS is a key performance indicator for systems handling high volumes of transactions.
It is commonly used in the context of payment processing systems, online banking, and stock trading platforms.
Higher TPS indicates better system performance and scalability.
For example, a payment gateway may...
5S is a methodology used for organizing a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate needed tools, parts, and instructions from unneeded items.
Set in order: Arrange items so they are easy to use and label them to eliminate searching.
Shine: Clean the work area and equipment regularly.
Standardize: Establish ...
based on 1 interview
Interview experience
Project Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Technician Apprentice Trainee
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Jakson Group
ReNew
Vestas
Wind World