i
Sterling Tools
Filter interviews by
I applied via Apna Jobs and was interviewed before Mar 2023. There were 2 interview rounds.
Practic Precautions:
1. The object to be electroplated must be cleaned thoroughly.
2. All connections must be clean, tight and free of corrosion.
3. The object to be electroplated must be connected to negative terminal of supply.
4. The electrodes should not be touch each other.
5. The current supplied by battery during the process should be constant.
40
6. The plate must be rinsed in dilute H₂SO₄ soon after removing from electrolyte, otherwise the deposit will turn back.
Precautions for electroplating process
Thoroughly clean the object to be electroplated to ensure a successful plating process.
Ensure all connections are clean, tight, and free of corrosion to prevent any interruptions in the electroplating process.
Connect the object to be electroplated to the negative terminal of the power supply.
Avoid letting the electrodes touch each other to prevent short circuits.
Maintain a constant...
The area of both sides of an object dipping into electrolyte can be calculated by finding the surface area of the object and multiplying it by 2.
Calculate the surface area of the object by using appropriate geometric formulas (e.g. for a rectangular object, use length x width).
Multiply the surface area by 2 to get the total area of both sides of the object.
Ensure that the object is fully submerged in the electrolyte to
I applied via Walk-in and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 7 Nov 2024
I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.
I have 5 years of experience in sales at XYZ Company, where I consistently exceeded sales targets and built strong relationships with clients.
Exceeded sales targets consistently
Built strong relationships with clients
Utilized CRM software to track leads and opportunities
posted on 27 Sep 2022
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
The steel making process involves converting iron ore into steel through various stages of heating, melting, and refining.
Iron ore is first mined and then refined to remove impurities.
The refined iron ore is then heated in a blast furnace to produce molten iron.
Alloying elements such as carbon, manganese, and chromium are added to the molten iron to create steel.
The molten steel is then poured into molds to cool and so...
posted on 3 Jun 2024
OOPs concepts are fundamental principles in object-oriented programming that help in organizing and designing code.
Encapsulation: Bundling data and methods that operate on the data into a single unit (class).
Inheritance: Ability of a class to inherit properties and behavior from another class.
Polymorphism: Ability to present the same interface for different data types.
Abstraction: Hiding the complex implementation deta...
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
I manage my workload by prioritizing tasks, delegating when necessary, and utilizing time management techniques.
Prioritize tasks based on deadlines and importance
Delegate tasks to team members to ensure efficiency
Use time management techniques such as setting goals and creating schedules
Regularly review and adjust workload to stay on track
Communicate with team members and supervisors to ensure alignment on priorities
Yes, I am willing to take on additional tasks to help others during busy schedules.
I believe in teamwork and helping each other out when needed
I am organized and efficient in managing my time to handle multiple tasks
I have experience in delegating responsibilities and coordinating with team members to ensure tasks are completed on time
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Simple aptitude test was conducted
SDLC life cycle in testing involves planning, designing, executing, and reporting on tests to ensure software quality.
The testing phase is an integral part of the SDLC process.
It involves creating test plans, test cases, and test scripts.
Tests are executed to identify defects and ensure software quality.
Defects are reported and tracked until they are resolved.
Testing is performed at various stages of the SDLC, includin...
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
based on 1 interview
Interview experience
Executive
79
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Executive
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
42
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Kennametal
Sandvik Asia
Wendt India