Filter interviews by
I applied via Referral and was interviewed before Jul 2021. There was 1 interview round.
Top trending discussions
posted on 21 Aug 2024
Steel margin refers to the difference between the cost of producing steel and the selling price.
Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.
It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.
Factors that can impact the steel margin include fluctuations in ...
The percentage of aggregate in gradation test varies depending on the specific requirements of the project.
The percentage of aggregate in gradation test is typically determined by the specifications provided for the project
It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix
For example, in a concrete mix design, the percentage of coarse aggregate ma...
The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.
Responsible for planning, organizing, and directing project activities
Ensuring project goals are met within budget and timeline
Managing resources and stakeholders effectively
Problem-solving and decision-making skills are essential
Strong communication and leadership skills are necessary
The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.
Calculate the cost of materials such as cement, aggregates, and reinforcement bars.
Consider the cost of labor for construction and installation of RCC components.
Include any additional costs such as equipment rental, transportation, and overhead expenses.
Factor in the cost of quality control me...
posted on 5 Jul 2024
posted on 24 Mar 2024
I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.
Selection of control valve is crucial for efficient project management in engineering.
Consider the type of fluid being controlled (liquid, gas, steam, etc.)
Evaluate the flow rate and pressure drop requirements
Take into account the temperature and pressure of the system
Factor in the material compatibility with the process fluid
Choose between different types of control valves such as globe, butterfly, ball, etc.
posted on 29 Nov 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 17 Sep 2021
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
Take appropriate action against contractors not complying with specifications.
Identify the specific non-compliance issues
Communicate the non-compliance to the contractors
Request corrective actions or modifications to meet the specifications
Monitor and document the progress of corrective actions
Consider penalties or contract termination if non-compliance persists
posted on 16 Apr 2022
My further most career goal is to become a director of project management.
To gain experience in managing large-scale projects
To develop leadership and communication skills
To build a strong network of industry professionals
To continuously learn and stay updated with industry trends
To achieve PMP certification
To work towards becoming a subject matter expert in project management
To mentor and train junior project managers
...
I applied via Recruitment Consulltant and was interviewed before Feb 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Mechanical Engineer
19
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Assistant Manager
18
salaries
| ₹3.1 L/yr - ₹10 L/yr |
Civil Site Engineer
14
salaries
| ₹2.2 L/yr - ₹4.6 L/yr |
Civil Engineer
14
salaries
| ₹2.1 L/yr - ₹5.4 L/yr |
Site Engineer
9
salaries
| ₹2.4 L/yr - ₹8 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries