Filter interviews by
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 15 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 3 Apr 2024
posted on 23 Mar 2024
Tonnage for press machine can be calculated using the formula: Tonnage = (Thickness of material * Width of material * Ultimate tensile strength) / 1000
Calculate the thickness of the material being used
Determine the width of the material
Find out the ultimate tensile strength of the material
Use the formula: Tonnage = (Thickness * Width * Ultimate tensile strength) / 1000
I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.
I was interviewed before Aug 2022.
Reducing machining cycle time can be achieved by optimizing tool paths, using high-speed machining techniques, implementing automation, and improving machine maintenance.
Optimize tool paths to reduce unnecessary movements and minimize idle time.
Utilize high-speed machining techniques to increase cutting speeds and feed rates.
Implement automation such as robotic loading and unloading to reduce manual handling time.
Regul...
To reduce air cutting from machine with ECRS Methodology, adjust cutting parameters, optimize tool paths, use high-quality cutting tools, and implement proper maintenance.
Adjust cutting parameters such as speed, feed rate, and depth of cut to minimize air cutting.
Optimize tool paths to ensure efficient cutting and reduce unnecessary movements.
Use high-quality cutting tools that are sharp and well-maintained to improve ...
Production Engineer
47
salaries
| ₹1.2 L/yr - ₹4.5 L/yr |
Quality Engineer
43
salaries
| ₹1.3 L/yr - ₹4.5 L/yr |
QA Engineer
39
salaries
| ₹1.5 L/yr - ₹3.9 L/yr |
Engineer
32
salaries
| ₹1.1 L/yr - ₹4.4 L/yr |
Senior Engineer
31
salaries
| ₹2.2 L/yr - ₹9.1 L/yr |
Mahindra & Mahindra
Tata Motors
Maruti Suzuki
Ashok Leyland