Upload Button Icon Add office photos

Filter interviews by

Smvd Poly Pack Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Round 1 - Group Discussion 

Related to the job profile and family backround etc.

Round 2 - Aptitude Test 

Check the tempering condition .

Round 3 - Technical 

(1 Question)

  • Q1. Working style and knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - No need the make over smart or very shade, should be honest well knowledgeable and smart working body language.

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. All basic of instrument,PLC, electrical, power etc are asked.
  • Q2. Please go through profibus basics, encoders, techometer, power consumption of plant & related, AC & DC Drives, Motor, Energy saving etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clam, intervers are very polite & excellent in nature.
At COSMO all are good & very supportive.
Very good place to work.

I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is preventive maintenance
  • Ans. 

    Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.

    • Regularly scheduled inspections and maintenance

    • Replacing worn or damaged parts before they cause a breakdown

    • Cleaning and lubricating equipment to prevent wear and tear

    • Keeping accurate records of maintenance activities

    • Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting

  • Answered by AI
  • Q2. What do you know about sap pm module
  • Ans. 

    SAP PM module is used for managing maintenance activities of an organization.

    • PM stands for Plant Maintenance

    • It helps in planning and scheduling maintenance tasks

    • Tracks equipment and maintenance history

    • Provides cost analysis and reporting

    • Integrates with other SAP modules like MM and FI

    • Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment

  • Answered by AI
  • Q3. What are the utilities equipments you handled
  • Ans. 

    I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.

    • Generators: responsible for maintenance and repair of diesel and gas generators

    • Chillers: handled installation and maintenance of air-cooled and water-cooled chillers

    • HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems

    • Water treatment plants: responsible for op...

  • Answered by AI
  • Q4. What are the various types of bearings
  • Ans. 

    Bearings are used to reduce friction between two moving parts. There are several types of bearings.

    • Plain bearings

    • Rolling element bearings

    • Jewel bearings

    • Fluid bearings

    • Magnetic bearings

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be technically well preparedness and be hardwork and be competent and be proactive in all activities

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About technical
Round 3 - HR 

(1 Question)

  • Q1. About HR related
Round 4 - One-on-one 

(1 Question)

  • Q1. About myself, tell me your self

Interview Preparation Tips

Interview preparation tips for other job seekers - All good
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR asked like your salary, company location expected salary and resion for change etc.
Round 3 - Technical 

(1 Question)

  • Q1. Questions like your profile which is mentioned on your resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skills, don't fear during interview,and technical knowledge and confident

I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What kind of work experience with you.
  • Q2. What is your actual need for annual salary.
  • Q3. Which kind of salary breakage you like.

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to update before all this things, what is the reason you are getting new job.

I applied via Naukri.com and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How is costing done, the full cost break up for diffrent types of bopp
  • Ans. 

    Costing for different types of BOPP involves various factors such as raw material cost, production cost, and overhead expenses.

    • Raw material cost includes the cost of polypropylene resin, additives, and other materials used in the production process.

    • Production cost includes expenses related to labor, energy, and maintenance of machinery.

    • Overhead expenses include costs related to administration, marketing, and distributi...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear concept of sales, customer orientation, good costing and tracking skills

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Experience in graduation.

Interview Preparation Tips

Interview preparation tips for other job seekers - It was good. They share valuable information and training.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
No response

I was interviewed before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What about Oracle
  • Q2. Are you handle all pressure
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What methods are used to prevent corrosion of railway tracks?
  • Ans. 

    Methods to prevent corrosion of railway tracks include regular inspection, painting, cathodic protection, and using corrosion-resistant materials.

    • Regular inspection of tracks to identify and address corrosion early

    • Painting the tracks with corrosion-resistant coatings

    • Applying cathodic protection to prevent corrosion

    • Using corrosion-resistant materials in track construction

    • Implementing proper drainage systems to prevent w

  • Answered by AI
  • Q2. It was about my family
  • Q3. Asked about my previous job
  • Q4. Why you left previous job
  • Ans. 

    Seeking new challenges and opportunities for growth.

    • Desire for career advancement

    • Looking for new challenges

    • Seeking better work-life balance

    • Relocation to a new area

    • Company downsizing or restructuring

    • Conflict with management or colleagues

  • Answered by AI
  • Q5. In how much time you will join
  • Ans. 

    I can join within 2 weeks of receiving a formal offer.

    • I will need to provide a notice period to my current employer.

    • I may need time to relocate if the job is in a different city.

    • I will need to finalize any pending commitments before joining.

    • I can start the onboarding process as soon as possible to expedite the joining date.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare yourself for the interview; do not simply show up unprepared.

Smvd Poly Pack Interview FAQs

How to prepare for Smvd Poly Pack interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Smvd Poly Pack. The most common topics and skills that interviewers at Smvd Poly Pack expect are Communication Skills, Convincing Power, Corel Draw, Illustrator and Photoshop.

Tell us how to improve this page.

Interview Questions from Similar Companies

Uflex Interview Questions
3.8
 • 106 Interviews
Cosmo Films Interview Questions
3.7
 • 33 Interviews
EPL Limited Interview Questions
3.9
 • 23 Interviews
TCPL Packaging Interview Questions
4.0
 • 14 Interviews
Vacmet India Interview Questions
4.2
 • 11 Interviews
Holostik Interview Questions
3.7
 • 8 Interviews
View all
Compare Smvd Poly Pack with

Uflex

3.8
Compare

EPL Limited

3.9
Compare

Jindal Poly Films

3.6
Compare

Hindusthan National Glass

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview