Upload Button Icon Add office photos

Siemens Energy

Compare button icon Compare button icon Compare

Filter interviews by

Clear (1)

Siemens Energy Instrument Commissioning Engineer Interview Questions and Answers

Updated 24 Dec 2024

Siemens Energy Instrument Commissioning Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. It's a new technology
  • Q2. Siemens turbine transmitter ext..

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Normal question about personality and job related

Interview Preparation Tips

Round: Test
Experience: Interview was going smoothly & all questions was related my job so it's was easy for me.
Tips: Good knowledge about of wind turbine
Duration: 2 hours
Total Questions: 25

Round: HR Interview
Experience: Interview was completed so easy
Tips: Required nice personality and confidence is must required

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Maintenance phylosophy
  • Ans. Depends on equipment running hour, criticality, availability and standby.
  • Answered Anonymously

Interview Preparation Tips

Topics to prepare for Thermax Limited Senior Engineer interview:
  • Boe
  • Energy manager
Interview preparation tips for other job seekers - Be confidential and technically strong.

I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About circuit breaker, transformer.
  • Q2. Single line diagrams, layout, substation calculation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please go through substation calculation and equipment.

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. GD&T QUESTION? Technical question?
  • Q2. GD&T- Geometric dimensioning & Tolerancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Very through with technical knowledge.
Good knowledge of practical.
Confidence will add advantage.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Discuss work related questions

Round 2 - HR 

(1 Question)

  • Q1. Salary discuss and other accommodation

Interview Preparation Tips

Interview preparation tips for other job seekers - Good for career growth and life cycle balance

I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Notice period of my present organisation
Round 2 - Technical 

(1 Question)

  • Q1. Site based question about TG Deck Slab, Ash Handling Package

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and if you r experienced like me, you should be well prepared about practical experience.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. About my academic
  • Q2. About salary & family background
Round 2 - Technical 

(2 Questions)

  • Q1. About college project
  • Q2. Some discussion on college studies

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Senior Engineer Interview Questions & Answers

Suzlon Group user image Abhishek Bagwan (ABHI)

posted on 25 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(22 Questions)

  • Q1. Can you provide an introduction about yourself?
  • Ans. 

    Experienced Senior Engineer with a strong background in software development and project management.

    • Over 10 years of experience in designing and implementing complex software solutions

    • Proficient in multiple programming languages such as Java, Python, and C++

    • Led cross-functional teams to successfully deliver projects on time and within budget

    • Strong problem-solving skills and ability to adapt to new technologies quickly

  • Answered by AI
  • Q2. Can you provide details about your work experience?
  • Ans. 

    I have over 10 years of experience in designing and implementing complex engineering solutions.

    • Designed and implemented various engineering solutions for different projects

    • Led a team of engineers to successfully complete a major project ahead of schedule

    • Collaborated with cross-functional teams to ensure project success

    • Utilized advanced engineering tools and techniques to optimize project outcomes

  • Answered by AI
  • Q3. What do you know about Doubly Fed Induction Generators?
  • Ans. 

    Doubly Fed Induction Generators (DFIGs) are commonly used in wind turbines to allow variable speed operation and improve efficiency.

    • DFIGs have two sets of windings - one on the stator and one on the rotor

    • The rotor windings are fed with variable frequency AC power through slip rings and brushes

    • DFIGs allow for control of both active and reactive power output

    • They are more efficient than fixed speed induction generators

    • DFI...

  • Answered by AI
  • Q4. What is the importance of circuit diagrams in electrical engineering?
  • Ans. 

    Circuit diagrams are essential in electrical engineering for visualizing and understanding complex circuits.

    • Circuit diagrams provide a visual representation of the connections and components in a circuit.

    • They help engineers analyze and troubleshoot circuits more efficiently.

    • Circuit diagrams aid in the design and construction of electrical systems.

    • They are crucial for documenting and communicating circuit designs to oth...

  • Answered by AI
  • Q5. What is the procedure for reading a wiring diagram?
  • Ans. 

    Reading a wiring diagram involves understanding symbols, following the flow of current, and identifying components.

    • Start by familiarizing yourself with the symbols used in the diagram.

    • Follow the flow of current from the power source to the components.

    • Identify the different components and their connections based on the diagram.

    • Pay attention to the color codes and labels for wires and components.

    • Refer to the legend or ke...

  • Answered by AI
  • Q6. What is an IGBT, how does it work, and what is the importance of diode capacitors in its functionality?
  • Ans. 

    IGBT stands for Insulated Gate Bipolar Transistor, a semiconductor device used for switching applications in power electronics.

    • IGBT is a type of power semiconductor device that combines the high efficiency of a MOSFET with the high current and low saturation voltage capability of a bipolar transistor.

    • It consists of three terminals: gate, collector, and emitter.

    • IGBT works by controlling the flow of current between the c...

  • Answered by AI
  • Q7. Can you provide training to your team?
  • Ans. 

    Yes, I have experience providing training to my team.

    • I have conducted training sessions on new technologies and tools for my team.

    • I have created training materials such as presentations, manuals, and hands-on exercises.

    • I have mentored junior team members to help them improve their skills.

    • I have received positive feedback from team members on the effectiveness of my training sessions.

  • Answered by AI
  • Q8. What are your computer skills?
  • Ans. 

    Proficient in various programming languages and software tools, with experience in database management and system administration.

    • Proficient in programming languages such as Java, Python, and C++

    • Experience with database management systems like MySQL and MongoDB

    • Skilled in system administration tasks including network configuration and troubleshooting

    • Familiar with software tools such as Git, Jenkins, and Docker

  • Answered by AI
  • Q9. How frequently are you able to climb towers as part of your job requirements?
  • Ans. 

    I climb towers as part of my job requirements on a regular basis.

    • I climb towers for routine maintenance checks

    • I climb towers to install or repair equipment

    • I climb towers to conduct inspections or surveys

    • On average, I climb towers at least once a month

  • Answered by AI
  • Q10. What is your understanding of the balance of plant (BOP)?
  • Ans. 

    BOP refers to the systems and equipment outside of the main power generating unit in a power plant.

    • BOP includes components like transformers, switchgear, cooling systems, and fuel systems.

    • It is essential for the overall functioning of the power plant.

    • BOP is responsible for supporting the main power generation unit and ensuring its efficient operation.

    • Examples of BOP components are water treatment systems, piping, and c

  • Answered by AI
  • Q11. What are SCADA (Supervisory Control and Data Acquisition) systems and PLC (Programmable Logic Controllers)?
  • Ans. 

    SCADA systems are used to monitor and control industrial processes, while PLCs are programmable devices used to automate machinery and processes.

    • SCADA systems gather and analyze real-time data from sensors and equipment in industrial settings.

    • SCADA systems allow operators to remotely monitor and control processes, alarms, and events.

    • PLCs are programmable devices used to automate machinery and processes based on input f...

  • Answered by AI
  • Q12. Can you create a controlling circuit diagram based on my specifications?
  • Ans. 

    Yes, I can create a controlling circuit diagram based on your specifications.

    • I will need detailed specifications including input/output requirements, components to be used, and any specific constraints.

    • I will create a schematic diagram using software like Eagle, Altium, or KiCad.

    • I will ensure the circuit meets safety standards and is optimized for performance.

    • I will provide documentation including a bill of materials a

  • Answered by AI
  • Q13. What is the difference between synchronous and asynchronous generators?
  • Ans. 

    Synchronous generators produce electricity at a constant frequency, while asynchronous generators do not require synchronization with the grid frequency.

    • Synchronous generators are connected to the grid and produce electricity at a fixed frequency, typically 50 or 60 Hz.

    • Asynchronous generators do not need to be synchronized with the grid frequency and can operate at variable speeds.

    • Synchronous generators are commonly us...

  • Answered by AI
  • Q14. What is the Standard Operating Procedure (SOP)?
  • Ans. 

    SOP is a set of step-by-step instructions compiled by an organization to help workers carry out routine operations.

    • SOP is a detailed document that outlines the procedures and processes to be followed in specific situations.

    • It ensures consistency and quality in the performance of tasks.

    • SOPs are used in various industries such as healthcare, manufacturing, and IT.

    • Examples include a SOP for handling customer complaints in...

  • Answered by AI
  • Q15. Are you familiar with DGR, MGR, or YGR?
  • Ans. 

    DGR, MGR, and YGR are commonly used acronyms in the engineering field.

    • DGR stands for Design Gross Rating, which is the maximum allowable weight for a designed structure.

    • MGR stands for Maximum Gross Rating, which is the maximum weight a vehicle can carry including its own weight.

    • YGR could refer to Yield Gross Rating, but context is needed to determine its specific meaning.

  • Answered by AI
  • Q16. Are you knowledgeable about Mean Time Between Failures (MTBF) and Mean Time To Repair (MTTR)?
  • Ans. 

    Yes, I am knowledgeable about MTBF and MTTR in the context of engineering.

    • MTBF refers to the average time between failures of a system or component.

    • MTTR is the average time it takes to repair a failed system or component.

    • Both metrics are important in assessing the reliability and maintenance needs of engineering systems.

    • For example, a server may have an MTBF of 10,000 hours and an MTTR of 2 hours.

  • Answered by AI
  • Q17. What is more important for system reliability, Mean Time Between Failures (MTBF) or Mean Time to Repair (MTTR)?
  • Ans. 

    MTTR is more important for system reliability as it directly impacts downtime and overall system availability.

    • MTTR directly impacts downtime and system availability

    • MTBF is important for predicting failures but does not address how quickly the system can be restored

    • Focusing on reducing MTTR can lead to improved system reliability and performance

  • Answered by AI
  • Q18. What is the function of a Doubly-Fed Induction Generator (DFIG) when used with an asynchronous generator?
  • Ans. 

    DFIG controls the active and reactive power independently, improving efficiency and stability in wind turbines.

    • DFIG allows for variable speed operation, improving efficiency in wind turbines.

    • It controls the active and reactive power independently, enhancing stability.

    • DFIG can provide grid support by injecting or absorbing reactive power as needed.

    • It is commonly used in wind turbines to improve power quality and grid in...

  • Answered by AI
  • Q19. What is slip in a generator?
  • Ans. 

    Slip in a generator refers to the difference between synchronous speed and actual rotor speed.

    • Slip is necessary for the generation of electrical power in a generator.

    • It is calculated as (Synchronous speed - Actual speed) / Synchronous speed.

    • Slip is typically expressed as a percentage.

    • Higher slip values indicate lower efficiency in the generator.

    • For example, in an induction generator, slip is essential for inducing curr

  • Answered by AI
  • Q20. What can you explain about sub-synchronous, synchronous, and super-synchronous speeds?
  • Ans. 

    Sub-synchronous, synchronous, and super-synchronous speeds refer to different speeds at which a rotating machine can operate in relation to the system frequency.

    • Sub-synchronous speed: When the machine speed is less than the synchronous speed, typically caused by a mechanical fault or system resonance.

    • Synchronous speed: When the machine speed matches the system frequency, commonly seen in normal operating conditions.

    • Sup...

  • Answered by AI
  • Q21. Importance of hub system, Nacelle system in wind turbine ?
  • Ans. 

    Hub system and Nacelle system are crucial components in a wind turbine for efficient energy generation.

    • The hub system connects the blades to the main shaft of the turbine, allowing for rotation and energy generation.

    • The Nacelle system houses the gearbox, generator, and other key components necessary for converting wind energy into electricity.

    • Proper maintenance and monitoring of these systems are essential for optimal ...

  • Answered by AI
  • Q22. About documentation
Contribute & help others!
anonymous
You can choose to be anonymous

Siemens Energy Interview FAQs

How many rounds are there in Siemens Energy Instrument Commissioning Engineer interview?
Siemens Energy interview process usually has 1 rounds. The most common rounds in the Siemens Energy interview process are Technical.
What are the top questions asked in Siemens Energy Instrument Commissioning Engineer interview?

Some of the top questions asked at the Siemens Energy Instrument Commissioning Engineer interview -

  1. Siemens turbine transmitter ex...read more
  2. it's a new technol...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

SALARIES

Power Grid Corporation of India

INTERVIEWS

Siemens Gamesa Renewable Power Private Limited

No Interviews

SALARIES

Power Grid Corporation of India

SALARIES

Power Grid Corporation of India

INTERVIEWS

Power Grid Corporation of India

No Interviews

SALARIES

Power Grid Corporation of India

INTERVIEWS

Siemens Gamesa Renewable Power Private Limited

40 top interview questions

INTERVIEWS

Power Grid Corporation of India

40 top interview questions

Tell us how to improve this page.

Siemens Energy Instrument Commissioning Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Thermax Limited Interview Questions
4.1
 • 251 Interviews
Adani Power Interview Questions
3.9
 • 218 Interviews
Tata Power Interview Questions
3.9
 • 162 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
Eaton Interview Questions
3.9
 • 119 Interviews
BHEL Interview Questions
4.1
 • 113 Interviews
GE Interview Questions
4.2
 • 102 Interviews
ReNew Interview Questions
4.2
 • 87 Interviews
Vestas Interview Questions
4.3
 • 83 Interviews
View all
Manager
144 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Design Engineer
130 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
86 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
69 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Siemens Energy with

Siemens

4.1
Compare

GE

4.2
Compare

BHEL

4.1
Compare

Thermax Limited

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent