Lag time calculations refer to the time delay between an event and its impact.
It is used in various fields such as finance, engineering, and project management.
It helps in predicting the impact of an event and planning accordingly.
For example, in project management, lag time calculations can help in determining the time required for a task to be completed after its predecessor task is finished.
Top trending discussions
posted on 15 Sep 2024
Yes, I have scripting knowledge in languages like Bash, PowerShell, and Python.
Proficient in Bash scripting for automation tasks
Experience with PowerShell scripting for Windows administration
Familiarity with Python scripting for system monitoring and management
LVM (Logical Volume Manager) is a tool used in Linux to manage storage by creating logical volumes from physical volumes.
LVM allows for dynamic resizing of logical volumes without needing to unmount the filesystem.
It consists of physical volumes (PVs), volume groups (VGs), and logical volumes (LVs).
PVs are physical storage devices like hard drives or partitions, VGs are a collection of PVs, and LVs are the virtual part...
posted on 29 Sep 2024
I applied via Campus Placement and was interviewed in Aug 2024. There was 1 interview round.
Profit loss percentage 50 mins
Senior Sales Engineer
18
salaries
| ₹5.6 L/yr - ₹14 L/yr |
Sales Engineer
14
salaries
| ₹4 L/yr - ₹6.5 L/yr |
Service Engineer
13
salaries
| ₹2.8 L/yr - ₹7.2 L/yr |
Sales Coordinator
9
salaries
| ₹5.7 L/yr - ₹9.1 L/yr |
Senior Sales and Application Engineer
7
salaries
| ₹6.5 L/yr - ₹11.2 L/yr |
Siemens Healthineers
Bosch
Honeywell Automation
ABB