I applied via Campus Placement and was interviewed in Aug 2019. There was 1 interview round.
I appeared for an interview before Sep 2021.
The capacity of the kiln depends on its size and design.
Capacity can range from a few hundred pounds to several tons.
Factors that affect capacity include the size and shape of the kiln, the type of fuel used, and the temperature required.
For example, a small pottery kiln may have a capacity of 50 pounds, while a large cement kiln can hold several hundred tons of material.
Capacity can also be increased by optimizing the
The length and diameter of the kiln depend on the specific design and purpose of the kiln.
The length and diameter of the kiln can vary greatly depending on the type of material being processed and the desired output.
For example, a cement kiln may have a length of 200 feet and a diameter of 14 feet, while a pottery kiln may only be 6 feet long and 3 feet in diameter.
The size of the kiln can also impact the efficiency an...
Clinker is formed by heating limestone, clay, and other materials in a kiln until they fuse together into small, marble-sized balls.
Clinker is a key component in the production of cement.
The raw materials are crushed and mixed together in the correct proportions.
The mixture is then heated in a kiln to a temperature of around 1450 degrees Celsius.
As the materials heat up, they fuse together into small, marble-sized ball...
I applied via Campus Placement
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
Heat exchangers are devices used to transfer heat between two or more fluids.
Shell and tube heat exchangers
Plate heat exchangers
Double pipe heat exchangers
Spiral heat exchangers
Air-cooled heat exchangers
Cooling tower is a heat rejection device that removes waste heat from a process system.
It works on the principle of evaporative cooling
Water is circulated through the tower and is exposed to air, which causes some of the water to evaporate
The heat from the process system is transferred to the water, which is then released into the atmosphere
The cooled water is then recirculated back into the process system
The tower can...
posted on 7 Dec 2023
I applied via Naukri.com and was interviewed before Dec 2022. There were 4 interview rounds.
We have to given aptitude test
I appeared for an interview in Feb 2025, where I was asked the following questions.
Maintaining cement quality involves rigorous testing, proper storage, and adherence to standards throughout production.
Regular testing of raw materials (e.g., limestone, clay) for chemical composition and purity.
Monitoring the grinding process to ensure consistent particle size distribution.
Implementing quality control measures during the mixing process to maintain the correct water-cement ratio.
Conducting strength tes...
Cement manufacturing involves raw material extraction, grinding, blending, heating, and cooling processes to produce clinker and cement.
1. Raw Material Extraction: Limestone and clay are mined and crushed.
2. Grinding: The raw materials are finely ground to a powder.
3. Blending: The ground materials are mixed in specific proportions.
4. Heating: The mixture is heated in a kiln at about 1400-1600°C to form clinker.
5. Cool...
In options trading, I utilize various software and tools for analysis, execution, and risk management.
Trading platforms like Thinkorswim or Interactive Brokers for executing trades.
Analytical tools such as Bloomberg Terminal for market data and analysis.
Risk management software to assess potential losses and gains.
Charting software for technical analysis and trend identification.
Backtesting tools to evaluate trading st
I applied via Recruitment Consulltant and was interviewed before Mar 2020. There was 1 interview round.
based on 10 reviews
Rating in categories
Assistant Manager
387
salaries
| ₹6 L/yr - ₹16.2 L/yr |
Officer
286
salaries
| ₹3 L/yr - ₹9.7 L/yr |
Senior Engineer
275
salaries
| ₹3.9 L/yr - ₹11.5 L/yr |
Assistant Officer
266
salaries
| ₹2 L/yr - ₹9 L/yr |
Senior Officer
262
salaries
| ₹4 L/yr - ₹11.2 L/yr |
UltraTech Cement
JK Cement
Grasim Industries
ACC