Upload Button Icon Add office photos

Schindler Group

Compare button icon Compare button icon Compare

Filter interviews by

Schindler Group Costing Engineer Interview Questions and Answers

Updated 1 Aug 2024

Schindler Group Costing Engineer Interview Experiences

1 interview found

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How much % did you achieve in degree?
  • Ans. 

    I achieved 85% in my degree.

    • I achieved a high percentage in my degree, showcasing my dedication and hard work.

    • My academic performance demonstrates my ability to excel in a challenging environment.

    • I consistently maintained a high GPA throughout my degree program.

    • For example, I achieved 85% in my degree program, reflecting my strong academic performance.

  • Answered by AI
  • Q2. Why are you not aware about the interviewer name ?
  • Ans. 

    I prioritize focusing on the content of the interview rather than the interviewer's name.

    • I believe that the interviewer's name is not as important as showcasing my skills and qualifications for the role.

    • I prefer to address the interviewer respectfully using 'sir' or 'ma'am' instead of their name.

    • I may have been provided with the interviewer's name but chose not to use it to avoid any potential mispronunciations or misu

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - HR should check the company selection criteria before selecting for interview as VP level person said in interview that you didn't achieve more than 70% so not able to higher even if you have successfully track record of 9 year of service

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Questions will be related to the post which company is offering.
  • Q2. Should be very accurate to all electronics queries

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart and to the point answers will help.

I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions on Process,Simulation, CAD

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Explain Compilation process steps?
  • Ans. 

    Compilation process involves several steps to convert source code into executable code.

    • Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.

    • Compilation: Translates source code into assembly code.

    • Assembly: Converts assembly code into machine code.

    • Linking: Combines object files and libraries to create an executable file.

    • Loading: Loads the executable file into memory and prepares it

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well prior the interview, revise all the basic concepts of Embedded C and MATLAB if you have applied for embedded systems.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is your experiencce
Round 1 - Technical 

(3 Questions)

  • Q1. Tell me about your work experience
  • Q2. What's the new VRF tech in Daikin
  • Q3. Ikwtr comparison for chiller and vrf
  • Ans. 

    Chiller and VRF systems differ in their cooling capacity, efficiency, and cost.

    • Chillers are better suited for large commercial buildings with high cooling loads.

    • VRF systems are more efficient and cost-effective for smaller buildings or individual rooms.

    • Chillers use water as a cooling medium, while VRF systems use refrigerant.

    • Chillers require more maintenance and have a longer lifespan than VRF systems.

    • VRF systems offer...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. How would you handle different meetings at a time.
Round 3 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Why are you looking for a change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Have the complete product knowledge.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Introduction, jobs & responsibility
Round 2 - Technical 

(1 Question)

  • Q1. As per CV all question
Round 3 - HR 

(1 Question)

  • Q1. Once again introduction, pervious company details information & salary discussion
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Tell me about yourself ?
  • Q2. About your work experience?

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence , good energy level
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What is lean manufacturing and 5'S ?
  • Ans. 

    Lean manufacturing is a systematic approach to eliminate waste and improve efficiency in production processes. 5'S is a method to organize and maintain a clean workplace.

    • Lean manufacturing focuses on reducing waste, such as overproduction, waiting time, transportation, inventory, motion, and defects.

    • It aims to improve efficiency, quality, and customer satisfaction.

    • 5'S is a set of five principles: Sort, Set in Order, Sh...

  • Answered by AI
  • Q2. What is TPM and industrial wastes?
  • Ans. 

    TPM stands for Total Productive Maintenance and refers to a systematic approach to equipment maintenance. Industrial wastes are unwanted materials or byproducts generated during industrial processes.

    • TPM is a proactive maintenance strategy aimed at maximizing equipment effectiveness and minimizing downtime.

    • It involves regular inspections, preventive maintenance, and continuous improvement of equipment and processes.

    • TPM ...

  • Answered by AI
  • Q3. PPE importance and it's importantance
  • Ans. 

    PPE (Personal Protective Equipment) is important for ensuring the safety and well-being of individuals in various industries.

    • PPE helps protect against physical, chemical, and biological hazards.

    • It includes items such as helmets, gloves, goggles, masks, and protective clothing.

    • PPE is crucial in industries like construction, healthcare, manufacturing, and mining.

    • Examples of PPE usage include wearing a hard hat on a const...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical trainings, working of engine, part location and identification
  • Q2. Making pots, ms office skills
Round 2 - One-on-one 

(1 Question)

  • Q1. Work ethics, project management, ms office usage skills, data automation skills, etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Get the job description clarified properly without any errors or confuion, because their hiring agent exotalent has a reputation of giving out erraneous job description and the job offered will be completely different from expected, and surprisingly your job roles will not be present in the offer letter.

Schindler Group Interview FAQs

How many rounds are there in Schindler Group Costing Engineer interview?
Schindler Group interview process usually has 1 rounds. The most common rounds in the Schindler Group interview process are One-on-one Round.

Tell us how to improve this page.

Schindler Group Costing Engineer Interview Process

based on 1 interview

Interview experience

1
  
Bad
View more

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 235 Interviews
Cummins Interview Questions
4.3
 • 231 Interviews
John Deere Interview Questions
4.1
 • 229 Interviews
Caterpillar Inc Interview Questions
4.3
 • 176 Interviews
KONE Interview Questions
4.1
 • 101 Interviews
Atlas Copco Interview Questions
4.2
 • 78 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
TÜV SÜD Interview Questions
3.9
 • 63 Interviews
Hilti Interview Questions
3.5
 • 60 Interviews
TK Elevator Interview Questions
3.9
 • 54 Interviews
View all
Customer Engineer
77 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Field Technician
38 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Customer Engineer
35 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
31 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive Accountant
27 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Schindler Group with

Otis Elevator

4.0
Compare

KONE

4.1
Compare

TK Elevator

3.9
Compare

Mitsubishi Electric India

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview