Sam India Built Well
Manco International General Contracting Interview Questions and Answers
Q1. Discuss about NDT Test
NDT (Non-Destructive Testing) is a method of testing materials without causing damage to the object being tested.
NDT is used to detect defects or irregularities in materials or structures.
Common NDT methods include ultrasonic testing, radiography, magnetic particle testing, and visual inspection.
NDT is widely used in industries such as aerospace, automotive, and construction to ensure the safety and reliability of products.
NDT can also be used in the medical field for diagnos...read more
Q2. What is main reason failure The construction
The main reason for construction failure is often due to poor planning, inadequate materials, or lack of proper supervision.
Poor planning can lead to errors in design or execution
Inadequate materials can result in structural weaknesses or failures
Lack of proper supervision can lead to mistakes going unnoticed and causing issues
Natural disasters or unforeseen circumstances can also contribute to construction failure
Q3. Tunnel monitoring system and how it's working
Tunnel monitoring system is a network of sensors and cameras used to monitor the structural integrity and safety of tunnels.
Tunnel monitoring systems use various sensors such as strain gauges, accelerometers, and tilt meters to detect any changes in the tunnel's condition.
These systems also include cameras for visual inspection and monitoring of traffic flow within the tunnel.
Data collected by the sensors and cameras is transmitted to a central control room where engineers ca...read more
Q4. Density of cement sand aggregate and water
Q5. Difference between colum and beam
Q6. Leaves in month
Paramedics are typically allowed a certain number of leaves per month for personal or medical reasons.
Paramedics are usually allowed a certain number of leaves per month for personal or medical reasons
The number of leaves may vary depending on the organization or company
Leaves may include sick leave, vacation leave, or personal leave
Paramedics may need to provide documentation or proof for medical leaves
Q7. Volume of 1bag cemwnt
Interview Process at Manco International General Contracting
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month