Premium Employer

i

This company page is being actively managed by Saint-Gobain Team. If you also belong to the team, you can get access from here

Saint-Gobain Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Saint-Gobain Associate Consultant Interview Questions, Process, and Tips for Freshers

Updated 27 Sep 2021

Saint-Gobain Associate Consultant Interview Experiences for Freshers

1 interview found

I applied via Campus Placement and was interviewed in Mar 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Tell me about yourself
  • Q2. Explain OTC cycle.
  • Ans. 

    OTC cycle refers to the process of Over-The-Counter trading of securities.

    • OTC trading involves direct trading between two parties without the involvement of a stock exchange.

    • OTC securities are not listed on formal exchanges and are traded through dealer networks.

    • OTC cycle includes negotiation, trade execution, and settlement.

    • OTC trading is common for small-cap and penny stocks.

    • OTC trading is less regulated than exchang

  • Answered by AI
  • Q3. 16 fields of pricing procedure
  • Ans. 

    The pricing procedure in SAP consists of 16 fields that determine the pricing calculation for a product or service.

    • The 16 fields include: Condition Type, Access Sequence, Condition Table, Calculation Type, Scale Basis, Scale Type, Condition Category, Condition Class, Condition Control, Calculation Type, Rounding Rule, Currency, Pricing Unit, Scale Quantity, Scale Value, and Condition Amount.

    • Each field plays a specific ...

  • Answered by AI
  • Q4. Tcode for account group & what is function of account group?
  • Ans. 

    Tcode for account group is OBD4. Account group is used to classify GL accounts based on their nature and usage.

    • Account group is a key element in the creation of GL accounts

    • It helps in defining the fields that are mandatory while creating a GL account

    • It also determines the number range for GL accounts

    • Examples of account groups are Assets, Liabilities, Income, Expenses, etc.

  • Answered by AI
  • Q5. Explain Third party process
  • Ans. 

    Third party process involves outsourcing a business function to a vendor or supplier.

    • Third party process involves hiring an external vendor or supplier to perform a business function.

    • This can include outsourcing IT services, customer support, or manufacturing.

    • The third party is responsible for delivering the service or product as per the agreed terms and conditions.

    • The company outsourcing the function retains overall c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you're fresher you should have basic knowledge of all business process

Skills evaluated in this interview

Interview questions from similar companies

Consultant Interview Questions & Answers

AECOM user image All job update And class

posted on 10 Sep 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

3 candidate was their vs 1 opening

Round 3 - One-on-one 

(1 Question)

  • Q1. There was a senior Social scientist, have taken interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. About java and collections of java
  • Q2. Related to Data structure and coding
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is sparksession
  • Ans. 

    SparkSession is the entry point for programming Spark with the Dataset and DataFrame API.

    • It replaces the older SQLContext and HiveContext in Spark 2.0 and later.

    • Allows users to create DataFrames and execute SQL queries.

    • Example: `val spark = SparkSession.builder.appName("MyApp").getOrCreate()`.

    • Supports reading data from various sources like JSON, Parquet, and JDBC.

    • Example: `val df = spark.read.json("path/to/file.json")`

  • Answered by AI
  • Q2. What spark architechture
  • Ans. 

    Apache Spark is a unified analytics engine for big data processing, with built-in modules for streaming, SQL, machine learning, and graph processing.

    • Spark operates on a cluster computing model, allowing distributed data processing.

    • It uses Resilient Distributed Datasets (RDDs) for fault tolerance and parallel processing.

    • Spark provides high-level APIs in Java, Scala, Python, and R, making it accessible to various develop...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - better good to have this place and multiple techs you can learn

I applied via Company Website and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Why are you the best person for this job?
Round 3 - HR 

(1 Question)

  • Q1. Details about your personal and professional experiance.

Interview Preparation Tips

Interview preparation tips for other job seekers - stay calm and positive, know yourself and what you want.

Interview Questionnaire 

15 Questions

  • Q1. What is pile?
  • Ans. 

    A pile is a long, cylindrical structure made of materials such as concrete, steel, or wood, used to support heavy loads.

    • Piles are commonly used in construction to support buildings, bridges, and other structures.

    • They are driven or drilled into the ground to provide stability and prevent settling or shifting.

    • Different types of piles include timber, concrete, steel, and composite piles.

    • Pile foundations are often used in ...

  • Answered by AI
  • Q2. What is vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is a test to determine the load carrying capacity of a pile.

    • A vertical load is applied to the pile using a hydraulic jack or a reaction frame.

    • The load is increased until the pile reaches its ultimate capacity or a predetermined limit.

    • The test helps in determining the pile's load settlement behavior and its ultimate bearing capacity.

    • The test is commonly used in the construction industry to ens...

  • Answered by AI
  • Q3. What is the lateral load test of pile ?
  • Ans. 

    Lateral load test of pile is a test to determine the lateral capacity of a pile.

    • It involves applying a horizontal load to the pile and measuring the deflection.

    • The test is conducted by using a hydraulic jack or a reaction frame.

    • The lateral load test helps in determining the lateral load capacity of the pile.

    • The test results are used to design the foundation of the structure.

    • The lateral load test is important for struct...

  • Answered by AI
  • Q4. IS code Vertical load test of pile ?
  • Ans. 

    Yes

    • Yes, there is an IS code for vertical load test of piles.

    • The relevant IS code is IS 2911 (Part 4): 2013 - 'Design and construction of pile foundations - Load test on piles'.

    • This code provides guidelines for conducting vertical load tests on piles to determine their load-carrying capacity and performance.

    • The code covers various aspects such as test setup, instrumentation, loading procedures, acceptance criteria, and ...

  • Answered by AI
  • Q5. Why I do vertical load test of pile ?
  • Ans. 

    Vertical load test of pile is done to determine the load carrying capacity of the pile.

    • To ensure the pile can support the intended load

    • To determine the settlement of the pile under load

    • To verify the design assumptions

    • To assess the quality of the pile installation

    • Examples: bridge piers, high-rise buildings, transmission towers

  • Answered by AI
  • Q6. Vertical load test procedure ?
  • Ans. 

    Vertical load test is a procedure to determine the load-bearing capacity of a structure.

    • The test involves applying a vertical load to the structure and measuring the resulting deflection.

    • The load is gradually increased until the structure reaches its maximum load-bearing capacity.

    • The test can be performed using hydraulic jacks, weights, or other equipment.

    • The results of the test are used to ensure the safety and stabil...

  • Answered by AI
  • Q7. Lateral load test procedure ?
  • Ans. 

    Lateral load test is a procedure to determine the strength and stability of a structure against horizontal forces.

    • The test involves applying a horizontal force to the structure and measuring its response.

    • The force is usually applied using hydraulic jacks or a reaction frame.

    • The test is performed on a representative section of the structure, such as a column or a wall.

    • The results of the test are used to verify the desig...

  • Answered by AI
  • Q8. What is the SPT test of soil ?
  • Ans. 

    SPT test is a standard penetration test used to determine the soil's resistance to penetration.

    • SPT test involves driving a standard sampler into the soil using a hammer of standard weight and height.

    • The number of blows required to drive the sampler a certain distance is recorded as the SPT N-value.

    • SPT test is commonly used in geotechnical engineering to determine soil properties such as shear strength and bearing capac...

  • Answered by AI
  • Q9. What is MPR ,WPR , DPR ?
  • Ans. 

    MPR, WPR, and DPR are acronyms used in various fields to represent different concepts.

    • MPR stands for Monthly Progress Report, which is a document that provides an overview of the progress made during a specific month.

    • WPR stands for Weekly Progress Report, which is a document that highlights the progress made on a weekly basis.

    • DPR stands for Daily Progress Report, which is a document that summarizes the daily progress m...

  • Answered by AI
  • Q10. BBS calculation of pile ?
  • Ans. 

    BBS calculation is a method used to determine the reinforcement required for a pile.

    • BBS stands for Bar Bending Schedule.

    • It involves calculating the length and number of steel bars required for the pile.

    • Factors such as load capacity, soil type, and pile diameter are taken into consideration.

    • The BBS is used to ensure the pile can withstand the required load and prevent failure.

  • Answered by AI
  • Q11. How meny test of pile ?
  • Ans. 

    The number of tests required for a pile depends on various factors such as the type of pile, soil conditions, and project requirements.

    • The number of tests can range from one to several depending on the project.

    • Common tests for piles include static load tests, dynamic load tests, and integrity tests.

    • Factors such as pile length, diameter, and soil type can affect the number of tests required.

    • The project specifications an...

  • Answered by AI
  • Q12. What is the cut off level of pile ?
  • Ans. 

    The cut off level of pile depends on various factors such as soil type, load capacity, and design requirements.

    • The cut off level of pile is the depth at which the pile is embedded into the ground.

    • It is determined by the soil type and load capacity of the ground.

    • The design requirements of the structure being built also play a role in determining the cut off level of pile.

    • For example, if the structure requires a deeper f...

  • Answered by AI
  • Q13. Minimum distance of detume bar of pile vertical load test ?
  • Ans. 

    The minimum distance of detume bar of pile vertical load test is typically 2.5 times the diameter of the pile.

    • The detume bar is used to measure the settlement of the pile during the load test.

    • The minimum distance is important to ensure accurate measurement of the pile settlement.

    • The distance is typically 2.5 times the diameter of the pile, but may vary depending on the specific test requirements.

    • If the distance is too ...

  • Answered by AI
  • Q14. Why I do dynamic load test of pile ?
  • Ans. 

    Dynamic load test of pile is done to assess its load carrying capacity and integrity.

    • To ensure the pile can withstand the expected load and prevent failure

    • To determine the pile's ultimate bearing capacity

    • To assess the pile's integrity and detect any defects or damage

    • To verify the design assumptions and optimize the foundation design

    • Examples: bridge piers, tall buildings, wind turbines, etc.

  • Answered by AI
  • Q15. Why I do integrity test of pile ?
  • Ans. 

    Integrity test of pile is done to ensure the pile is structurally sound and can bear the required load.

    • To ensure the pile is not damaged during installation

    • To check if the pile is free from any defects or cracks

    • To verify if the pile can bear the required load

    • To ensure the safety of the structure and its occupants

    • Examples: Sonic Integrity Testing, Crosshole Sonic Logging, etc.

  • Answered by AI

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Why we use CAN in automotive?
  • Ans. 

    CAN is used in automotive for reliable and real-time communication between electronic control units.

    • CAN allows for communication between various electronic control units in a vehicle

    • It is reliable and can handle real-time data transmission

    • CAN is widely used in automotive for applications such as engine control, transmission control, and more

  • Answered by AI
  • Q2. What does a CAN frame look like ?
  • Ans. 

    A CAN frame is a data structure used in Controller Area Network (CAN) communication, consisting of an identifier, data, and control bits.

    • A CAN frame typically consists of an 11-bit or 29-bit identifier, which helps prioritize messages on the bus.

    • It also includes a data field, which can range from 0 to 8 bytes depending on the protocol version.

    • Control bits like the start of frame, arbitration field, control field, data ...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your current location? Are you able to commute to the office location?
  • Ans. 

    I am currently located in downtown Seattle and I am able to commute to the office location.

    • Located in downtown Seattle

    • Able to commute to office location

    • Have reliable transportation

  • Answered by AI
  • Q2. What is your expected salary?
  • Ans. 

    My expected salary is based on my experience, skills, and the market rate for software developers.

    • Consider my years of experience in software development.

    • Take into account my specialized skills and certifications.

    • Research the current market rate for software developers in this location.

    • Be open to negotiation based on the overall compensation package offered.

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. HTML5, Javascript question
  • Q2. Responsive Web Design
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What is you present package?
Round 3 - Technical 

(1 Question)

  • Q1. What is quality control and quality assurance.?
  • Ans. 

    Quality control involves checking the quality of products during production, while quality assurance focuses on preventing defects before they occur.

    • Quality control involves inspecting products to ensure they meet specific standards and requirements.

    • Quality assurance involves implementing processes and procedures to prevent defects and errors in the production process.

    • Quality control is reactive, focusing on identifyin...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is slump test
  • Ans. 

    Slump test is a concrete test to measure the consistency and workability of freshly mixed concrete.

    • It involves filling a slump cone with concrete, then removing the cone and measuring how much the concrete slumps or settles.

    • The amount of slump can indicate the water content, mix proportions, and consistency of the concrete.

    • A higher slump value indicates a more workable mix, while a lower slump value indicates a stiffer...

  • Answered by AI
  • Q2. Mix design of concrete
  • Ans. 

    Concrete mix design involves determining the proportions of ingredients to achieve desired properties.

    • Concrete mix design is the process of selecting suitable ingredients and determining their proportions to produce concrete with desired properties.

    • Factors to consider in mix design include strength, workability, durability, and cost.

    • Examples of ingredients in concrete mix design are cement, water, aggregates, and admix

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. What is Pile foundation
  • Ans. 

    Pile foundation is a type of deep foundation used to transfer loads from a structure to a stronger layer of soil or rock deep below the surface.

    • Pile foundations are used when shallow foundations are not feasible due to weak soil conditions or high structural loads.

    • There are different types of pile foundations, including driven piles, bored piles, and screw piles.

    • Pile foundations can be made of materials such as concret...

  • Answered by AI

Saint-Gobain Interview FAQs

What are the top questions asked in Saint-Gobain Associate Consultant interview for freshers?

Some of the top questions asked at the Saint-Gobain Associate Consultant interview for freshers -

  1. Tcode for account group & what is function of account gro...read more
  2. 16 fields of pricing proced...read more
  3. Explain Third party proc...read more

Tell us how to improve this page.

Join Saint-Gobain Leader in Light and Sustainable Construction

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 449 Interviews
KEC International Interview Questions
4.0
 • 309 Interviews
Tata Technologies Interview Questions
3.6
 • 263 Interviews
TCE Interview Questions
3.8
 • 251 Interviews
AECOM Interview Questions
4.2
 • 118 Interviews
View all
Saint-Gobain Associate Consultant Salary
based on 49 salaries
₹3.1 L/yr - ₹11.4 L/yr
29% less than the average Associate Consultant Salary in India
View more details

Saint-Gobain Associate Consultant Reviews and Ratings

based on 7 reviews

3.6/5

Rating in categories

3.6

Skill development

4.8

Work-life balance

3.5

Salary

4.9

Job security

4.6

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 7 Reviews and Ratings
Team Member
526 salaries
unlock blur

₹1.4 L/yr - ₹8.3 L/yr

Key Account Manager
180 salaries
unlock blur

₹5.4 L/yr - ₹18 L/yr

Senior Software Engineer
166 salaries
unlock blur

₹6.5 L/yr - ₹24.1 L/yr

Software Engineer
164 salaries
unlock blur

₹3 L/yr - ₹14 L/yr

Production Engineer
157 salaries
unlock blur

₹1 L/yr - ₹9.7 L/yr

Explore more salaries
Compare Saint-Gobain with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview